Governor's Mansion Renovation All Records
|
Note ID: | JL354 | Weather Conditions: | Cloudy, low 70's | Report Author: | Joseph D. Lahendro | Report Date: | 9/29/1999 | Location: | Mansion - North Elevation | Work Type: | New Masonry Construction | Notes: | Video and digital photos of newly built retaining wall between new driveway and north garden. Shows concrete retailing wall after and during removal of forms. |
|
|
Note ID: | JL362 | Weather Conditions: | Cloudy, low 70's | Report Author: | Joseph D. Lahendro | Report Date: | 9/29/1999 | Location: | Mansion - Second Floor - Dressing Room and Bedroom (E) / Governor's Bedroom (R) | Work Type: | Miscellaneous | Notes: | Video and digital photos of workman installing new mortise lockset on northwest door. |
|
|
Note ID: | JL361 | Weather Conditions: | Cloudy, low 70's | Report Author: | Joseph D. Lahendro | Report Date: | 9/29/1999 | Location: | Mansion - Second Floor - General | Work Type: | New Finish Application | Notes: | Video and digital photos of newly installed heart pine strip flooring. Workmen installing flooring in Governor's Dressing area. |
|
|
Note ID: | JL363 | Weather Conditions: | Cloudy, low 70's | Report Author: | Joseph D. Lahendro | Report Date: | 9/29/1999 | Location: | Mansion - Second Floor - Library (E/R) | Work Type: | Window Conservation | Notes: | Video and digital photos of workmen reinstalling window sash with new weight chains and weatherstripping. |
|
|
Note ID: | JL364 | Weather Conditions: | Cloudy, low 70's | Report Author: | Joseph D. Lahendro | Report Date: | 9/29/1999 | Location: | Mansion - Second Floor - Northeast Bedroom and Bath (E) / Family Room (R) | Work Type: | Miscellaneous | Notes: | Video and digital photos of newly installed new door mortise latchsets. |
|
|
Note ID: | JL357 | Weather Conditions: | Cloudy, low 70's | Report Author: | Joseph D. Lahendro | Report Date: | 9/29/1999 | Location: | Mansion - West Elevation | Work Type: | Miscellaneous | Notes: | Video and digital photos of newly milled balusters, stacked in first floor Governor's Office. These balusters appear to be replacements for deteriorated balusters in roof parapet wall installed just a few years ago. |
No image available
|
|
Note ID: | MS726 | Weather Conditions: | Sunny, high 70s | Report Author: | Mary Harding Sadler | Report Date: | 10/2/1999 | Location: | Carriage House - East Elevation | Work Type: | Miscellaneous | Notes: | The cooling tower dominates the east elevation of the Carriage House. The 2nd floor window has not yet been installed. |
|
|
Note ID: | MS725 | Weather Conditions: | Sunny, high 70s | Report Author: | Mary Harding Sadler | Report Date: | 10/2/1999 | Location: | Carriage House - North Elevation | Work Type: | Miscellaneous | Notes: | A 2nd spot for daily lunches (after the West Portico) is the north side of the Carriage House. The upper floor of the Carriage House has been used for paint storage and to complete repairs to windows and doors. |
|
|
Note ID: | MS727 | Weather Conditions: | Sunny, high 70s | Report Author: | Mary Harding Sadler | Report Date: | 10/2/1999 | Location: | Carriage House - South Elevation | Work Type: | Miscellaneous | Notes: | Repairs to masonry openings on the Carriage House's south elevation continue. Most of the new louvers connected to the through-wall HVAC units have been installed. |
|
|
Note ID: | MS698 | Weather Conditions: | Sunny, high 70s | Report Author: | Mary Harding Sadler | Report Date: | 10/2/1999 | Location: | Cottage - East Elevation | Work Type: | New Finish Application | Notes: | Finish work continues on the Cottage exterior. The new 2nd floor entry doors have been primed. The window sash have been removed from the 2nd Floor for paint removal and repair. |
|