Governor's Mansion Renovation All Records
|
Note ID: | MS733 | Weather Conditions: | Rainy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/17/1999 | Location: | Mansion - First Floor - North Foyer (E/R) | Work Type: | New Finish Application | Notes: | The plaster walls and wood trim have been repaired and the entry door stripped in preparation for new finishes. |
|
|
Note ID: | MS734 | Weather Conditions: | Rainy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/17/1999 | Location: | Mansion - First Floor - Old Governor's Office (E/R) | Work Type: | New Finish Application | Notes: | Finish boards presenting proposed papers and fabrics are brought to the Mansion for consideration. Different paint colors are sampled on the wainscot in the Old Governor's Office. |
|
|
Note ID: | MS735 | Weather Conditions: | Rainy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/17/1999 | Location: | Mansion - First Floor - South Ballroom (E/R) | Work Type: | New Finish Application | Notes: | Paint finishes in the South and North Ballrooms are nearly complete (with the exception of marbelizing, which has not yet begun). A finish board with samples of proposed fabrics and papers has been brought to the space for consideration. |
|
|
Note ID: | MS732 | Weather Conditions: | Rainy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/17/1999 | Location: | Mansion - North Elevation | Work Type: | Miscellaneous | Notes: | Paint removal at the North Portico is complete. The new column bases have been milled but they are not yet installed. |
|
|
Note ID: | MS754 | Weather Conditions: | Rainy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/17/1999 | Location: | Mansion - Second Floor - Bath #1 (E/R) | Work Type: | Miscellaneous | Notes: | The new shower stall has been constructed in Bath #1 and the walls and floor have been tiled. Custom glass shower walls and door have not yet been installed. |
|
|
Note ID: | MS749 | Weather Conditions: | Rainy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/17/1999 | Location: | Mansion - Second Floor - Bath #4 (E/R) | Work Type: | Miscellaneous | Notes: | Bath #4 still needs additional repairs to its window. The window does not yet have a sill. It appears that the sash weights have just been reinstalled. |
|
|
Note ID: | MS744 | Weather Conditions: | Rainy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/17/1999 | Location: | Mansion - Second Floor - East Bedroom (E) / First Lady's Dressing and Bathroom (R) | Work Type: | New Finish Application | Notes: | The marble top and surround for the First Lady's "Jacuzzi" whirlpool have been installed. |
|
|
Note ID: | MS745 | Weather Conditions: | Rainy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/17/1999 | Location: | Mansion - Second Floor - East Bedroom (E) / First Lady's Dressing and Bathroom (R) | Work Type: | Miscellaneous | Notes: | New wardrobes with concealed lighting have been installed in the first Lady's Dressing Rooms. |
No image available
|
|
Note ID: | MS746 | Weather Conditions: | Rainy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/17/1999 | Location: | Mansion - Second Floor - East Bedroom (E) / First Lady's Dressing and Bathroom (R) | Work Type: | Miscellaneous | Notes: | New casework has been installed in the First Lady's Dressing Rooms. |
|
|
Note ID: | MS750 | Weather Conditions: | Rainy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/17/1999 | Location: | Mansion - Second Floor - Elevator Foyer (A) | Work Type: | New Finish Application | Notes: | Elaine Hamilton and her crew have painted a trompe l'oeil finish on the 2nd Floor elevator door that allows this steel door to look like the historic 6-panel doors throughout the Mansion. |
|