Note ID: | MS781 | Weather Conditions: | Sunny, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/21/1999 | Location: | Mansion - North Elevation | Work Type: | New Finish Application | Notes: | The north wall of the new addition has not received a final coat of paint. The newly completed cast concrete canopy over the entrance has not been painted. |
|
|
Note ID: | MS774 | Weather Conditions: | Sunny, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/21/1999 | Location: | Mansion - Second Floor - Dressing Room and Bedroom (E) / Governor's Bedroom (R) | Work Type: | Miscellaneous | Notes: | Wiring of the Governor's Bedroom continues, along with installation of recessed can lights in the ceiling. |
|
|
Note ID: | MS773 | Weather Conditions: | Sunny, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/21/1999 | Location: | Mansion - Second Floor - Elevator Foyer (A) | Work Type: | Miscellaneous | Notes: | Work on the elevator installation continues. |
|
|
Note ID: | MS772 | Weather Conditions: | Sunny, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/21/1999 | Location: | Miscellaneous | Work Type: | Miscellaneous | Notes: | Bob Vila and crew are in town to continue their filming of the project. |
|
|
Note ID: | MS782 | Weather Conditions: | Sunny, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/21/1999 | Location: | Site - General | Work Type: | Miscellaneous | Notes: | The new driveway that runs outside the North Garden wall is being paved to match the existing circular drive. A tilted soldier course of brick on either side forms a gutter. |
|
|
Note ID: | MS779 | Weather Conditions: | Sunny, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/21/1999 | Location: | Site - General | Work Type: | Miscellaneous | Notes: | A concrete pad defining a new, gently curved path, winding along the east wall of the Mansion and the South Garden's east wall, has been poured. Brick pavers will be laid as the path's finish material. |
|
|
Note ID: | MS778 | Weather Conditions: | Sunny, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/21/1999 | Location: | Site - General | Work Type: | Miscellaneous | Notes: | Paving contractors are installing a cobblestone lined driveway between the Carriage House and the South Garden, and adjacent to the east wall of the South Garden. Cast concrete pavers form the field of the driveway. |
|
|
Note ID: | MS771 | Weather Conditions: | Sunny, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 10/21/1999 | Location: | Site - West Garden | Work Type: | Miscellaneous | Notes: | Trenches for the sprinkler system are being dug by DGS staff. |
|
|
Note ID: | JL421 | Weather Conditions: | Sunny, mid 60's | Report Author: | Joseph D. Lahendro | Report Date: | 10/23/1999 | Location: | Carriage House - North Elevation | Work Type: | New Masonry Construction | Notes: | Video and digital photos of masonry unit paving at the service courtyard next to the carriagehouse, and at the end of the curved sidewalk along the east side of the property. |
|
|
Note ID: | JL420 | Weather Conditions: | Sunny, mid 60's | Report Author: | Joseph D. Lahendro | Report Date: | 10/23/1999 | Location: | Cottage - East Elevation | Work Type: | Miscellaneous | Notes: | Video and digital photos of new temporary construction work area for material storage, on terrace outside cottage. |
|