Governor's Mansion Renovation All Records
|
Note ID: | MS791 | Weather Conditions: | Sunny, mid-70s | Report Author: | Mary Harding Sadler | Report Date: | 10/31/1999 | Location: | Mansion - South Elevation | Work Type: | Miscellaneous | Notes: | Painting the South elevation is almost complete. The new South Portico lantern made by Bill Toombs to convey the same character, at a smaller scale, as the lantern on the West Portico, has been installed. The stripped and repaired balustrade has been reinstalled on the porch, but it has not yet been repainted. |
No image available
|
|
Note ID: | MS787 | Weather Conditions: | Sunny, mid-70s | Report Author: | Mary Harding Sadler | Report Date: | 10/31/1999 | Location: | Mansion - West Elevation | Work Type: | Miscellaneous | Notes: | Restoration of the West (front) Portico is nearly complete. New cast fleurettes and other ornament have been fabricated and installed to match the historic moldings. The lantern restored by Bill Toombs has been reinstalled. |
|
|
Note ID: | MS786 | Weather Conditions: | Sunny, mid-70s | Report Author: | Mary Harding Sadler | Report Date: | 10/31/1999 | Location: | Site - General | Work Type: | Miscellaneous | Notes: | New landscaping materials have been planted along the bank that rises from Governor's Street into Capitol Square and the Governor's Mansion precinct. |
No image available
|
|
Note ID: | MS789 | Weather Conditions: | Sunny, mid-70s | Report Author: | Mary Harding Sadler | Report Date: | 10/31/1999 | Location: | Site - General | Work Type: | Miscellaneous | Notes: | Paving of the newly reconfigured driveway continues. |
No image available
|
|
Note ID: | MS790 | Weather Conditions: | Sunny, mid-70s | Report Author: | Mary Harding Sadler | Report Date: | 10/31/1999 | Location: | Site - South Garden | Work Type: | Miscellaneous | Notes: | A massive clean-up effort is underway, inside and out, as the project draws to a close. |
No image available
|
|
Note ID: | MS784 | Weather Conditions: | Sunny, mid-70s | Report Author: | Mary Harding Sadler | Report Date: | 10/31/1999 | Location: | Site - West Garden | Work Type: | Miscellaneous | Notes: | A massive site clean-up effort is underway, combined with efforts to plant new landscape materials. New sod has been mounded around the fountain in the center of the entry court. The paved driveway is rinsed with water and scoured with brushes rotating beneath a small street-cleaning vehicle. |
|
|
Note ID: | MS783 | Weather Conditions: | Sunny, mid-70s | Report Author: | Mary Harding Sadler | Report Date: | 10/31/1999 | Location: | Site - West Garden | Work Type: | New Masonry Construction | Notes: | The brick veneer on the new Guard House has been installed, along with cast stone sills and framing for the new windows. |
|
|
Note ID: | JL466 | Weather Conditions: | Rainy, mid 70's | Report Author: | Joseph D. Lahendro | Report Date: | 11/2/1999 | Location: | Mansion - First Floor - Dining Room (E/R) | Work Type: | Floor Conservation | Notes: | Video and digital photos of floor refinishing test patch, descibed above, following drying. |
|
|
Note ID: | JL470 | Weather Conditions: | Rainy, mid 70's | Report Author: | Joseph D. Lahendro | Report Date: | 11/2/1999 | Location: | Mansion - First Floor - Ladies Parlor (E/R) | Work Type: | New Finish Application | Notes: | Video and digital photos of paperhanger installing wallpaper liner over plaster walls. Liner is fiberglass material, and is made to go underneath wallpaper. Liner must be primed with paint before installing wallpaper. |
No image available
|
|
Note ID: | JL465 | Weather Conditions: | Rainy, mid 70's | Report Author: | Joseph D. Lahendro | Report Date: | 11/2/1999 | Location: | Mansion - First Floor - Stair Hall (E/R) | Work Type: | New Finish Application | Notes: | Video and digital photos of plasterers working on north stair walls, sanding new plaster skim coat applied over previously painted plaster walls because architect decided existing walls were too rough. Views of completed skimed walls in south stair. |
|