Governor's Mansion Renovation All Records
|
Note ID: | JL474 | Weather Conditions: | Sunny, mid 70's | Report Author: | Joseph D. Lahendro | Report Date: | 11/5/1999 | Location: | Site - General | Work Type: | Miscellaneous | Notes: | Video and digital photos of newly installed trees and shrubs along east side of property next to Governor Street, including just delivered bedding plants. |
No image available
|
|
Note ID: | MS811 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Cottage - East Elevation | Work Type: | New Finish Application | Notes: | Painters are working to complete finish work on the 2nd floor of the Cottage. Lanterns fabricated by Bill Toombs have been installed in the ground floor loggia. Entry doors are being painted dark green. |
No image available
|
|
Note ID: | MS812 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Cottage - First Floor - Back Hall (E/R) | Work Type: | Miscellaneous | Notes: | Where old hardware could be refurbished and reinstalled it was; some historic rim locks have been reused in the Cottage. In other cases, new lever hardware has been installed. |
No image available
|
|
Note ID: | MS814 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Cottage - First Floor - Living Room (E/R) | Work Type: | New Finish Application | Notes: | The exposed brick hearths in the Cottage's Living Room and in the North Bedroom have been preserved and maintained with their associated hardware. To complement the dark historic finishes, the north wall of the Living Room has been painted crimson. The new casework and shelving have been painted white. |
No image available
|
|
Note ID: | MS813 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Cottage - First Floor - Stair Hall (E/R) | Work Type: | New Finish Application | Notes: | A majority of the wood work in the entry hall of the Cottage has been re- finished with a dark varnish. |
No image available
|
|
Note ID: | MS816 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Cottage - Second Floor - Bath (E/R) | Work Type: | New Finish Application | Notes: | Installation of the new wallpaper had just been completed when the mirrror hanger punctured a water pipe as he installed a mirror over the lavatory. The wall paper must be reinstalled. |
No image available
|
|
Note ID: | MS817 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Cottage - Second Floor - North Bedroom (E/R) | Work Type: | Miscellaneous | Notes: | New finishes have been installed in the 2nd floor of the Cottage, including a new neutral-colored carpet which leaves a narrow border of the historic flooring exposed. Furnishings have been returned to this space. New venetian blinds have been installed. |
No image available
|
|
Note ID: | MS815 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Cottage - Second Floor - South Bedroom (E/R) | Work Type: | New Finish Application | Notes: | New finishes have been installed in the 2nd floor of the Cottage, including a new neutral-colored carpet which leaves a narrow border of the historic flooring exposed. Furnishings are being installed in this space. New venetian blinds have been installed. |
No image available
|
|
Note ID: | MS832 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Mansion - Attic | Work Type: | New Finish Application | Notes: | New finishes have been installed throughout the attic (except that wood floor remains to be painted). The largest of the storage closets has been carpeted. |
No image available
|
|
Note ID: | MS819 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Mansion - Basement - General | Work Type: | New Finish Application | Notes: | All visitors and workers are now required to wear disposible blue booties while in the Mansion in order to protect the newly refinished flooring. |
No image available
|