Governor's Mansion Renovation All Records
|
Note ID: | MS808 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Mansion - East Elevation | Work Type: | Miscellaneous | Notes: | The addition and its new entry have been painted to match the rest of the Mansion. Consequently the addition blends in with the historic Mansion almost seamlessly. Even the new limestone trim has been painted white to blend in with the patched and painted historic stone trim on the Mansion. |
No image available
|
|
Note ID: | MS822 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Mansion - First Floor - Old Governor's Office (E/R) | Work Type: | Floor Conservation | Notes: | A floor conservator is struggling to install an oak diffuser cover. He modifies the duct and surrounding framing slightly, in order to make this work. The oak diffuser will allow this element for match the surrounding flooring as much as possible. |
No image available
|
|
Note ID: | MS806 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Mansion - North Elevation | Work Type: | New Finish Application | Notes: | The addition and its new entry have been painted to match the rest of the Mansion. Consequently the addition blends in with the historic Mansion almost seamlessly. Even the new limestone trim has been painted white to blend in with the patched and painted stone trim on the Mansion. |
No image available
|
|
Note ID: | MS825 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Mansion - Second Floor - Bedroom and Bathroom #2 (R) | Work Type: | New Finish Application | Notes: | Bedroom #2 appears to be completely finished. This bedroom has been re-painted, perhaps five times, in different shades of blue, in order to satisfy its future occupant and his parents. |
No image available
|
|
Note ID: | MS843 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Mansion - Second Floor - Capitol Room (E/R) | Work Type: | Floor Conservation | Notes: | Flooring has recently been refinished on the 2nd floor. Where the finish is still wet, the rooms are blocked off with tape. All workers and visitors are wearing blue paper booties in order to minimize damage to the new finishes. |
No image available
|
|
Note ID: | MS826 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Mansion - Second Floor - Dressing Room and Bedroom (E) / Governor's Bedroom (R) | Work Type: | Miscellaneous | Notes: | The new Governor's Bedroom appears to be completely finished except for installion of switch and outlet plates. |
No image available
|
|
Note ID: | MS829 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Mansion - Second Floor - East Bedroom (E) / First Lady's Dressing and Bathroom (R) | Work Type: | Miscellaneous | Notes: | Hardware, casework, and mirrors in the First Lady's Batthroom have been installed. |
No image available
|
|
Note ID: | MS828 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Mansion - Second Floor - Elevator Foyer (A) | Work Type: | New Finish Application | Notes: | A trompe l'oeil painting representing the typical 6-panel door found in the Mansion, has been completed on the 2nd floor elevator door. |
No image available
|
|
Note ID: | MS830 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Mansion - Second Floor - Family Kitchen (A) | Work Type: | Miscellaneous | Notes: | Hardware, cabinets, and fixtures in the First Family's Kitchen have been installed. Appliances for this private kitchen have not yet arrived. |
No image available
|
|
Note ID: | MS824 | Weather Conditions: | Sunny, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 11/13/1999 | Location: | Mansion - Second Floor - General | Work Type: | Miscellaneous | Notes: | A carpenter's helper is countersinking nails and filling the nailholes throughout the 2nd floor. |
No image available
|