Note ID: | MS14 | Weather Conditions: | sunny, mid-70s | Report Author: | Mary Harding Sadler | Report Date: | 5/10/1999 | Location: | Mansion - West Elevation | Work Type: | New Concrete Construction | Notes: | Workers are unloading concrete through a basement window in order to pour underpinnings along the west wall. |
No image available
|
|
Note ID: | JL12 | Weather Conditions: | Sunny. Mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 5/11/1999 | Location: | Mansion - Attic | Work Type: | Demolition | Notes: | Video of stockpiled demolition material awaiting removal. |
No image available
|
|
Note ID: | JL6 | Weather Conditions: | Sunny. Mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 5/11/1999 | Location: | Mansion - Basement - Maid's Room (E) | Work Type: | Demolition | Notes: | Video and digital photos of east door showing seams of larger original door opening changed for existing opening. |
|
|
Note ID: | JL3 | Weather Conditions: | Sunny. Mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 5/11/1999 | Location: | Mansion - Basement - Mansion Director (E/R) | Work Type: | Excavation | Notes: | Video and digital photos of excavation (clay and river rock) and concrete underpinning. |
|
|
Note ID: | JL2 | Weather Conditions: | Sunny. Mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 5/11/1999 | Location: | Mansion - Basement - Security Chief (E) / Office (R) | Work Type: | Excavation | Notes: | Video of excavation (clay and river rock) and concrete underpinning. |
No image available
|
|
Note ID: | JL1 | Weather Conditions: | Sunny. Mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 5/11/1999 | Location: | Mansion - Basement - Women's Room (E) | Work Type: | On-site paint removal | Notes: | Video and digital photos of removing earth (clay mixed with river rock) and underpinning brick walls. The lower original foundation wall in the northwest corner turns out to be consistant throughout this room. In fact, beneath the later plaster the brick walls are painted to about 1' below the former top of slab. Evidently this room, historically, had a lower finished floor level. The brick wall between this room and the next room to the south has two wythes of brick on the north face extend down to the lower floor level, and the remaining wythes on the south side stop at a higher elevation and sit on the clay/river rock fill found elsewhere. |
|
|
Note ID: | JL7 | Weather Conditions: | Sunny. Mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 5/11/1999 | Location: | Mansion - First Floor - Scullery (E/R) | Work Type: | Demolition | Notes: | Video and digital photos of east face of original east/rear exterior wall, now exposed by the elevator removal. Observable for the first time is a brick infilled opening towards the north end of the elevator. The historic former opening is very tall, about 10' to 12' tall. Just visible at its top is a dressed stone lintel. |
|
|
Note ID: | JL8 | Weather Conditions: | Sunny. Mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 5/11/1999 | Location: | Mansion - First Floor - South Ballroom (E/R) | Work Type: | Floor Conservation | Notes: | Observed Rich (Tidewater Preservation) repairing damaged parquetry with new. |
No image available
|
|
Note ID: | MS168 | Weather Conditions: | Partly cloudy, low 80's | Report Author: | Mary Harding Sadler | Report Date: | 5/12/1999 | Location: | Mansion - Basement - Beneath Ballrooms | Work Type: | Demolition | Notes: | The entire basement area below the ballrooms is demolished and slab is broken into large chunks. The last section to be demolished is the center hall. The east wall (the original rear wall of the mansion) of this large area is temporarily shored up at several points. Already a mason has begun repairing the jambs and lintels of the modified openings. |
No image available
|
|
Note ID: | MS4 | Weather Conditions: | evening, low 70s | Report Author: | Mary Harding Sadler | Report Date: | 5/12/1999 | Location: | Mansion - Basement - Coat Room (E) / Reception (R) | Work Type: | Demolition | Notes: | Much of the underpinning has been completed in this area. |