Note ID: | MS283 | Weather Conditions: | Partly cloudy, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 6/14/1999 | Location: | Mansion - Basement - Kitchen (E/R) | Work Type: | Framing | Notes: | The basement ceiling/first floor framing is temporarily shored up as new partitions are built within the space. |
|
|
Note ID: | MS284 | Weather Conditions: | Partly cloudy, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 6/14/1999 | Location: | Mansion - Basement - Kitchen (E/R) | Work Type: | New Masonry Construction | Notes: | New and altered masonry openings in the south end of the kitchen have been repaired. The kitchen doorway remains in place (it will ultimately be removed and the opening infilled) and is used for delivery of material and for removal of debris. |
|
|
Note ID: | MS280 | Weather Conditions: | Partly cloudy, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 6/14/1999 | Location: | Mansion - Basement - Mansion Director (E/R) | Work Type: | Miscellaneous | Notes: | Increasing amounts of utilities are run through the joist space of the Mansion Director's Office. The mechanical units in the ceiling will be feeding the Ladies Parlor above. |
|
|
Note ID: | MS277 | Weather Conditions: | Partly cloudy, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 6/14/1999 | Location: | Mansion - Basement - Security Office (E) / Executive Protection Unit (R) | Work Type: | Miscellaneous | Notes: | Installation of mechanical, electrical, and plumbing equipment in the joist space of the Security Office continues, resulting in a second phase of "demolition." The impact of utilities installation is concentrated in the west half of the basement. Original joists are cut as needed to keep this new infrastructure above the ceiling in these low spaces. Joists are supplemented in order to ensure structural stability. The mechanical units placed in the joist space of this room are feeding the Old Governor's Office. The large timber window headers are removed to make room for the new diffusers. The contractors and the architect are struggling to maintain desired ceiling heights while concealing utilities. The casualties in this effort are the original structural members. |
|
|
Note ID: | MS279 | Weather Conditions: | Partly cloudy, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 6/14/1999 | Location: | Mansion - Basement - Security Office (E) / Executive Protection Unit (R) | Work Type: | Framing | Notes: | The simple casework under the chimney support in the Security Office is preserved in place. When the cabinet doors open, one can see the original masonry arch supporting the chimney, mantel, and hearth of the fireplace in the Old Governor's Office above. |
|
|
Note ID: | MS276 | Weather Conditions: | Partly cloudy, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 6/14/1999 | Location: | Mansion - First Floor - Stair Hall (E/R) | Work Type: | Demolition | Notes: | At both north and south ends of the 1st floor Stairhall wall canvas has been removed, exposing the location of earlier stairs that paralleled the rise of the existing stairs. |
|
|
Note ID: | MS275 | Weather Conditions: | Partly cloudy, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 6/14/1999 | Location: | Mansion - Second Floor - Dressing Room and Bedroom (E) / Governor's Bedroom (R) | Work Type: | Demolition | Notes: | Quartersawn fir flooring and sub-flooring have been removed from the north half of the Governor's Bedroom in preparation for adding supplemental floor framing. |
|
|
Note ID: | JL125 | Weather Conditions: | Cloudy mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 6/15/1999 | Location: | Mansion - Attic | Work Type: | Miscellaneous | Notes: | Video of entire attic showing progress of mechanical rough-in. |
No image available
|
|
Note ID: | JL127 | Weather Conditions: | Cloudy mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 6/15/1999 | Location: | Mansion - Basement - General | Work Type: | Miscellaneous | Notes: | Video of entire basement showing progress of rough carpentry, and mechanical and electrical rough-in. Focused on damage to original fabric caused by "integration" of new systems. |
No image available
|
|
Note ID: | JL126 | Weather Conditions: | Cloudy mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 6/15/1999 | Location: | Mansion - Basement - Security Office (E) / Executive Protection Unit (R) | Work Type: | Demolition | Notes: | Video and digital photos of altered original framing above all three windows. Removed original lintels were in wheelbarrow to be disposed. |
|