Note ID: | MS293 | Weather Conditions: | Overcast, high 60s | Report Author: | Mary Harding Sadler | Report Date: | 6/16/1999 | Location: | Mansion - Basement - Kitchen (E/R) | Work Type: | New Masonry Construction | Notes: | The new concrete block wall separating the Kitchen from the Serving/Scullery area is nearly complete. |
|
|
Note ID: | MS299 | Weather Conditions: | Overcast, high 60s | Report Author: | Mary Harding Sadler | Report Date: | 6/16/1999 | Location: | Mansion - Basement - Tunnel (E/R) | Work Type: | Miscellaneous | Notes: | The area over the door to the Tunnel is packed with new utility lines. |
|
|
Note ID: | MS298 | Weather Conditions: | Overcast, high 60s | Report Author: | Mary Harding Sadler | Report Date: | 6/16/1999 | Location: | Mansion - Basement - Women (R) | Work Type: | Miscellaneous | Notes: | Utility lines are roughed in the new Women's Room. |
|
|
Note ID: | MS286 | Weather Conditions: | Overcast, high 60s | Report Author: | Mary Harding Sadler | Report Date: | 6/16/1999 | Location: | Mansion - First Floor - Entrance Hall (E/R) | Work Type: | Miscellaneous | Notes: | Electricians are installing wiring in the baseboard area. Baseboards have been removed. The baseboard has been numbered and stored in the basement of the Finance Building. In light of the cutting and patching that would be required in order to reuse the historic baseboard, a decision is made to use new baseboard in most of the 1st floor. Outlets and receptacles have been carefully centered beneath the paneled wainscot. |
|
|
Note ID: | MS296 | Weather Conditions: | Overcast, high 60s | Report Author: | Mary Harding Sadler | Report Date: | 6/16/1999 | Location: | Mansion - First Floor - Stair Hall (E/R) | Work Type: | Demolition | Notes: | An electrical panel box was removed from the South Stairhall revealing some original brick work. Silver display casework at the adjacent door (opening into the Ladies Parlor) was removed. New door casing with historically appropriate molding will be reinstalled. |
|
|
Note ID: | MS289 | Weather Conditions: | Overcast, high 60s | Report Author: | Mary Harding Sadler | Report Date: | 6/16/1999 | Location: | Mansion - Second Floor - Bath #1 (E/R) | Work Type: | Miscellaneous | Notes: | Generations of wall finishes continue to be exposed in this south-facing 2nd floor bathroom. |
|
|
Note ID: | MS288 | Weather Conditions: | Overcast, high 60s | Report Author: | Mary Harding Sadler | Report Date: | 6/16/1999 | Location: | Mansion - Second Floor - Bath #4 (E/R) | Work Type: | Miscellaneous | Notes: | New exhaust duct can be seen in the ceiling above the bathroom. The wallpaper border in this space may date from the Baliles renovation efforts. |
|
|
Note ID: | MS295 | Weather Conditions: | Overcast, high 60s | Report Author: | Mary Harding Sadler | Report Date: | 6/16/1999 | Location: | Mansion - Second Floor - Bedroom and Bathroom #2 (R) | Work Type: | Miscellaneous | Notes: | The area over the former elevator shaft was more poorly framed than originally assessed. Framing of this area was also compromised by earlier (1950s?) removal of the brick walls that joined the original mansion to the 1906 wing. Workmen narrowly avoided an accident when some of the ceiling framing failed while they were installing ductwork in the attic. |
|
|
Note ID: | JL131 | Weather Conditions: | Scattered showers, mid 70s | Report Author: | Joseph D. Lahendro | Report Date: | 6/17/1999 | Location: | Mansion - Basement - Hall (E) / Stairhall (R) | Work Type: | Demolition | Notes: | Video and digital photos of south stair ceiling showing original and later infill ceiling floor joists cut in half horizontally for new systems. The infill joists are spanning an early (original?) stair opening adjacent to the west wall. Exposed a large cut nail spike at an infill header/joist connection. |
|
|
Note ID: | JL130 | Weather Conditions: | Scattered showers, mid 70s | Report Author: | Joseph D. Lahendro | Report Date: | 6/17/1999 | Location: | Mansion - Basement - Storage (R) | Work Type: | Demolition | Notes: | Video and digital photos of new fan coil unit in place at ceiling following removal of two 5' sections of original floor joists. Typical for the numerous new units installed in the basement. Views of stacked removed joist sections. |
|