Governor's Mansion Renovation All Records
|
Note ID: | JL145 | Weather Conditions: | Partly cloudy, mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 6/25/1999 | Location: | Mansion - Second Floor - Above Ballrooms | Work Type: | Miscellaneous | Notes: | Video and digital photos of new slots cut into the plaster ceiling below for installation of new HVAC linear registers. The linear registers will be in the ballroom ceilings about 1' from the boxed beam separating the center hall from each ballroom. |
|
|
Note ID: | JL157 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 6/29/1999 | Location: | Mansion - Basement - General | Work Type: | New Finish Application | Notes: | Video and digital photos showing general views of new partitions, especially progress of new drywall and insulation work. |
|
|
Note ID: | JL158 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 6/29/1999 | Location: | Mansion - Basement - Hall (E) / Hall and Dumbwaiter (R) | Work Type: | Miscellaneous | Notes: | Video and digital photos of new dumbwaiter shaft and steel frame. |
|
|
Note ID: | JL151 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 6/29/1999 | Location: | Mansion - First Floor - Entrance Hall (E/R) | Work Type: | Demolition | Notes: | Video and digital photos of new chase holes and electrical outlets cut into original brick walls behind removed baseboards. |
|
|
Note ID: | JL150 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 6/29/1999 | Location: | Mansion - First Floor - Old Governor's Office (E/R) | Work Type: | Demolition | Notes: | Video and digital photos of laborer removing original brick at south end of fireplace stack where the baseboard has been removed. Creating chase for new utility lines. Views of other new chases cut into original brick walls in this room for new electrical outlets. |
|
|
Note ID: | JL159 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 6/29/1999 | Location: | Mansion - North Elevation | Work Type: | New Masonry Construction | Notes: | Video and digital photos of new addition construction progress showing new concrete block foundation walls with earth and gravel fill being installed to raise grade level to underside of concrete slab to be installed. |
|
|
Note ID: | JL154 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 6/29/1999 | Location: | Mansion - Second Floor - Capitol Room (E/R) | Work Type: | Demolition | Notes: | Video of slots cut into ceiling for new linear HVAC registers at north and south sides of room. |
No image available
|
|
Note ID: | JL153 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 6/29/1999 | Location: | Mansion - Second Floor - Old Governor's Bedroom (E/R) | Work Type: | Demolition | Notes: | Video of slots cut into ceiling for new linear HVAC registers at north and south sides of room. |
No image available
|
|
Note ID: | MS352 | Weather Conditions: | Scattered clouds, thunder storms, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 6/30/1999 | Location: | Mansion - Basement - Entrance Hall (A) | Work Type: | New Masonry Construction | Notes: | The walls of the new addition are slowly rising from the ground. |
|
|
Note ID: | MS359 | Weather Conditions: | Scattered clouds, thunder storms, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 6/30/1999 | Location: | Mansion - Basement - General | Work Type: | Miscellaneous | Notes: | The various teams of subcontractors are challenged by the task of efficiently weaving the numerous layers of utilities in the tight area between ceiling joists and above the finish ceiling level. |
|