Governor's Mansion Renovation All Records
|
Note ID: | MS339 | Weather Conditions: | Scattered clouds, thunder storms, mid-60s | Report Author: | Mary Harding Sadler | Report Date: | 6/30/1999 | Location: | Mansion - West Elevation | Work Type: | Miscellaneous | Notes: | A smaller, painted plywood model of the proposed guard house has been installed so that the physical and visual impact of this structure can be assessed. |
|
|
Note ID: | JL161 | Weather Conditions: | Sunny, mid 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/2/1999 | Location: | Mansion - Basement - General | Work Type: | Framing | Notes: | Video and digital photos of general views of showing progress of drywall installation on new partitions, including continued electrical rough-in work. |
|
|
Note ID: | JL165 | Weather Conditions: | Sunny, mid 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/2/1999 | Location: | Mansion - First Floor - South Foyer (E/R) | Work Type: | Demolition | Notes: | Video and digital photos of west wall, north of door, showing chase cut into original brick wall for new utility lines. |
|
|
Note ID: | JL164 | Weather Conditions: | Sunny, mid 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/2/1999 | Location: | Mansion - First Floor - Stair Hall (E/R) | Work Type: | Demolition | Notes: | Video and digital photos of west wall at north stair showing two chases cut into original brick wall, north and south of door, for new utility lines. |
|
|
Note ID: | JL160 | Weather Conditions: | Sunny, mid 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/2/1999 | Location: | Mansion - North Elevation | Work Type: | New Concrete Construction | Notes: | Video and digital photos of laborers installing new concrete slab for basement level floor of new addition. |
|
|
Note ID: | JL162 | Weather Conditions: | Sunny, mid 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/2/1999 | Location: | Mansion - Second Floor - Dressing Room (E) / Governor's Dressing Room and Bathroom (R) | Work Type: | Miscellaneous | Notes: | Video and digital photos of plumbers installing sanitary lines for new water closet in new bathroom. |
|
|
Note ID: | MS363 | Weather Conditions: | Hazy, mid-90s | Report Author: | Mary Harding Sadler | Report Date: | 7/6/1999 | Location: | Mansion - Attic | Work Type: | Framing | Notes: | Knee walls in attic have been framed following utilities installation. |
|
|
Note ID: | MS377 | Weather Conditions: | Hazy, mid-90s | Report Author: | Mary Harding Sadler | Report Date: | 7/6/1999 | Location: | Mansion - Basement - Entrance Hall (A) | Work Type: | New Masonry Construction | Notes: | The new addition continues to rise; it has reached the level of the basement floor. New utility lines have penetrated the north wall of the 1906 addition to feed into this space. |
|
|
Note ID: | MS376 | Weather Conditions: | Hazy, mid-90s | Report Author: | Mary Harding Sadler | Report Date: | 7/6/1999 | Location: | Mansion - Basement - Hall (E) / Service Hall (R) | Work Type: | New Masonry Construction | Notes: | The new masonry opening to the Service Hall (east end) has been repaired and furred out to receive drywall. |
|
|
Note ID: | MS373 | Weather Conditions: | Hazy, mid-90s | Report Author: | Mary Harding Sadler | Report Date: | 7/6/1999 | Location: | Mansion - Basement - Hall (E) / Stairhall (R) | Work Type: | Miscellaneous | Notes: | The number of utility lines running down the basement Stairhall continues to grow. Electrical lines are run in metal conduit. The orange plastic pipes are sprinkler lines. |
|