Governor's Mansion Renovation All Records
|
Note ID: | JL186 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/16/1999 | Location: | Mansion - Attic | Work Type: | Demolition | Notes: | Video and digitial photos of general views showing stacks of demolished original floor boards and structure removed for new utility lines. |
|
|
Note ID: | JL190 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/16/1999 | Location: | Mansion - Basement - General | Work Type: | New Finish Application | Notes: | Video and digital photos of general views showing ongoing work. Laborers installing new metal furring in the kitchen. Laborer finishing drywall surfaces by installing tape compound. At west side some wood door frames and casings have been installed. Laborer installing electrical leveling device in new men's toilet in preparation for the new ceiling metal support structure. Newly installed metal ceiling structure in place in adjoining north room. |
|
|
Note ID: | JL189 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/16/1999 | Location: | Mansion - Basement - Security Office (E) / Executive Protection Unit (R) | Work Type: | Demolition | Notes: | Video and digital photos of laborer jackhammering the concrete infill at the bottom of the recess in the east wall original brick chimney stack arched support structure. The face of original brick walls within the recess, and newly exposed by the demolition work, appear to be painted white indicating their historic exposure and finish. |
|
|
Note ID: | JL188 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/16/1999 | Location: | Mansion - First Floor - Scullery (E/R) | Work Type: | Miscellaneous | Notes: | Video of HVAC mechanics installing new air handling unit below the upper floor structure. |
No image available
|
|
Note ID: | JL187 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/16/1999 | Location: | Mansion - First Floor - Scullery (E/R) | Work Type: | Demolition | Notes: | Video and digital photos of west wall where removal of finishes has exposed an infilled original window at, what used to be, the south end of the original house's rear east wall. Plywood covers the window opening. The original stone sill was hacked off for finishes associated with the 1906 addition. Below the plywood's south edge is a beaded wood jamb which may be original. |
|
|
Note ID: | JL180 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/16/1999 | Location: | Mansion - North Elevation | Work Type: | New Masonry Construction | Notes: | Video and digital photos of pallets, lying on the lawn north of the house, with new limestone window lintels and sills for new addition. |
|
|
Note ID: | JL181 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/16/1999 | Location: | Mansion - North Elevation | Work Type: | New Masonry Construction | Notes: | Video and digital photos of new north addition where masons are constructing concrete block walls. Height of new block walls are about top of basement level. |
|
|
Note ID: | JL182 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/16/1999 | Location: | Mansion - North Elevation | Work Type: | Excavation | Notes: | Video of laborers excavating earth from bottom of areaway next to north wall for new foundation drainage system. Laborers report no artifacts found. |
No image available
|
|
Note ID: | JL184 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/16/1999 | Location: | Mansion - Second Floor - Above Ballrooms | Work Type: | Framing | Notes: | Video and digital photos of newly installed plywood subfloor with sill plates for new partitions. Plumbers installing ceiling supports for new pipes. |
|
|
Note ID: | MS417 | Weather Conditions: | Scattered clouds, mid-70s | Report Author: | Mary Harding Sadler | Report Date: | 7/19/1999 | Location: | Mansion - Attic | Work Type: | Framing | Notes: | Framing for the attic partitions is nearly complete. The historic skylight is retained over the center of the attic space. Utilities are concealed behind the partition walls, as are the chimney masses, diagonal braces, and other framing members. |
|