Pages :   1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125   Previous  Next Page

Note ID: MS439
Weather Conditions: Sunny, low 90s
Report Author: Mary Harding Sadler
Report Date: 7/24/1999
Location: Mansion - Basement - Security Office (E) / Executive Protection Unit (R)
Work Type: New Finish Application
Notes: The walls of the Security Office have been drywalled and primed. The grid for the suspended acoustical tile ceiling is installed. The double tenon joints supporting the header carrying the hearth and fireplace above are almost completely concealed by new utility lines.


Governor's Mansion Renovation Photograph  


Note ID: MS440
Weather Conditions: Sunny, low 90s
Report Author: Mary Harding Sadler
Report Date: 7/24/1999
Location: Mansion - Basement - Women (R)
Work Type: New Finish Application
Notes: The walls of the Women's Room have been drywalled using water resistant drywall, but the walls are not taped or primed. A drywall ceiling has also been installed.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: MS436
Weather Conditions: Sunny, low 90s
Report Author: Mary Harding Sadler
Report Date: 7/24/1999
Location: Mansion - East Elevation
Work Type: Demolition
Notes: Holes are made in the brick walls adjacent to the service entry on the east kitchen wall. A concrete block pier supports the door opening. Soon the opening will be completely filled except for these major utility line penetrations. A utility yard will later be enclosed in this area outside the kitchen.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  



Note ID: MS433
Weather Conditions: Sunny, low 90s
Report Author: Mary Harding Sadler
Report Date: 7/24/1999
Location: Mansion - First Floor - Dining Room (E/R)
Work Type: Miscellaneous
Notes: New linear diffusers and return air grilles have been roughed in above doorways in the Dining Room. This placement will minimize the visibility of mechanical system components.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: MS422
Weather Conditions: Sunny, low 90s
Report Author: Mary Harding Sadler
Report Date: 7/24/1999
Location: Mansion - First Floor - North Foyer (E/R)
Work Type: Miscellaneous
Notes: The areas channeled for concealment of vertical utility lines are filled with a cement product ("Sack Crete"). Pieces of plywood are used as formwork.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: MS434
Weather Conditions: Sunny, low 90s
Report Author: Mary Harding Sadler
Report Date: 7/24/1999
Location: Mansion - First Floor - Scullery (E/R)
Work Type: Miscellaneous
Notes: The original east (rear) wall of the Mansion is exposed in the future Scullery, while utility lines and mechanical systems components continue to be installed. Installation of the new dumbwaiter in this space is complete.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: MS423
Weather Conditions: Sunny, low 90s
Report Author: Mary Harding Sadler
Report Date: 7/24/1999
Location: Mansion - First Floor - Stair Hall (E/R)
Work Type: New Finish Application
Notes: Plaster patching is under way in the 1st floor Stairhall.


Governor's Mansion Renovation Photograph  


Note ID: MS435
Weather Conditions: Sunny, low 90s
Report Author: Mary Harding Sadler
Report Date: 7/24/1999
Location: Mansion - North Elevation
Work Type: New Masonry Construction
Notes: Construction of the concrete block walls of the new addition is nearly complete.


Governor's Mansion Renovation Photograph  


Note ID: MS428
Weather Conditions: Sunny, low 90s
Report Author: Mary Harding Sadler
Report Date: 7/24/1999
Location: Mansion - Second Floor - Above Ballrooms
Work Type: Framing
Notes: The new partitions in the 2nd floor area over the North and South Ballrooms have been framed in.


Governor's Mansion Renovation Photograph  


Note ID: MS430
Weather Conditions: Sunny, low 90s
Report Author: Mary Harding Sadler
Report Date: 7/24/1999
Location: Mansion - Second Floor - Bath #1 (E/R)
Work Type: Miscellaneous
Notes: More vertical utility lines are run through the walls of Bathroom #1 from the South Foyer below.


Governor's Mansion Renovation Photograph  

Pages :   1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125   Previous  Next Page