Governor's Mansion Renovation All Records
|
Note ID: | MS439 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Basement - Security Office (E) / Executive Protection Unit (R) | Work Type: | New Finish Application | Notes: | The walls of the Security Office have been drywalled and primed. The grid for the suspended acoustical tile ceiling is installed. The double tenon joints supporting the header carrying the hearth and fireplace above are almost completely concealed by new utility lines. |
|
|
Note ID: | MS440 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Basement - Women (R) | Work Type: | New Finish Application | Notes: | The walls of the Women's Room have been drywalled using water resistant drywall, but the walls are not taped or primed. A drywall ceiling has also been installed. |
|
|
Note ID: | MS436 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - East Elevation | Work Type: | Demolition | Notes: | Holes are made in the brick walls adjacent to the service entry on the east kitchen wall. A concrete block pier supports the door opening. Soon the opening will be completely filled except for these major utility line penetrations. A utility yard will later be enclosed in this area outside the kitchen. |
|
|
Note ID: | MS433 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - First Floor - Dining Room (E/R) | Work Type: | Miscellaneous | Notes: | New linear diffusers and return air grilles have been roughed in above doorways in the Dining Room. This placement will minimize the visibility of mechanical system components. |
|
|
Note ID: | MS422 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - First Floor - North Foyer (E/R) | Work Type: | Miscellaneous | Notes: | The areas channeled for concealment of vertical utility lines are filled with a cement product ("Sack Crete"). Pieces of plywood are used as formwork. |
|
|
Note ID: | MS434 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - First Floor - Scullery (E/R) | Work Type: | Miscellaneous | Notes: | The original east (rear) wall of the Mansion is exposed in the future Scullery, while utility lines and mechanical systems components continue to be installed. Installation of the new dumbwaiter in this space is complete. |
|
|
Note ID: | MS423 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - First Floor - Stair Hall (E/R) | Work Type: | New Finish Application | Notes: | Plaster patching is under way in the 1st floor Stairhall. |
|
|
Note ID: | MS435 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - North Elevation | Work Type: | New Masonry Construction | Notes: | Construction of the concrete block walls of the new addition is nearly complete. |
|
|
Note ID: | MS428 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Second Floor - Above Ballrooms | Work Type: | Framing | Notes: | The new partitions in the 2nd floor area over the North and South Ballrooms have been framed in. |
|
|
Note ID: | MS430 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Second Floor - Bath #1 (E/R) | Work Type: | Miscellaneous | Notes: | More vertical utility lines are run through the walls of Bathroom #1 from the South Foyer below. |
|