Governor's Mansion Renovation All Records
|
Note ID: | MS431 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Second Floor - Bath #4 (E/R) | Work Type: | Demolition | Notes: | Brick walls are channeled in order to conceal water supply and drain lines in Bathroom #4. |
|
|
Note ID: | MS427 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Second Floor - Bath #4 (E/R) | Work Type: | Demolition | Notes: | Demolition of layers of finish materials continues in Bathroom #4 (similar to Bath #1). As with other 2nd floor bathrooms, the top of the joists were beveled in an earlier renovation in which a mud bed and ceramic tile floor were installed. |
|
|
Note ID: | MS425 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Second Floor - Bedroom and Bathroom #2 (R) | Work Type: | Framing | Notes: | Wood framing of partitions is nearly complete in the new Bedroom and Bathroom #2. |
|
|
Note ID: | MS424 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Second Floor - Dressing Room and Bedroom (E) / Governor's Bedroom (R) | Work Type: | Framing | Notes: | Wood framing of partitions is nearly complete in the new Governor's Bedroom. |
|
|
Note ID: | MS432 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Second Floor - Northeast Bedroom and Bath (E) / Family Room (R) | Work Type: | Framing | Notes: | New partition walls in the future Family Room have been framed in. |
|
|
Note ID: | MS426 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Second Floor - Private Dining Room, Bathroom, and Powder Room (E) / Bedroom and Bathroom #3 (R) | Work Type: | Framing | Notes: | Wood framing of partitions is underway in the new Bedroom #3. Demolition of old flooring and subflooring has revealed an early hearth in an area that will be reconfigured as two closets. |
|
|
Note ID: | MS421 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - West Elevation | Work Type: | Excavation | Notes: | Excavation under the West Portico is complete and the drain line can be installed. A gravel bed has been spread in the areaway along the front elevation. |
|
|
Note ID: | JL214 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/26/1999 | Location: | Cottage - East Elevation | Work Type: | Demolition | Notes: | Video and digital photos of new trench excavated just outside of exterior wall, within covered walkway, for a new underground sanitary sewer collection box (at north end) and pipe. Trench is about 2 1/2' wide and 5' deep. No prior building features seen in sides of trench, but excavated material is same mixture of river rock and clay seen in mansion's basement excavations. Could this be an original fill material? |
|
|
Note ID: | JL213 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/26/1999 | Location: | Mansion - Basement - General | Work Type: | Miscellaneous | Notes: | Video of general construction progress showing installation of finish woodwork, and mechanics installing new utility lines. |
No image available
|
|
Note ID: | JL203 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/26/1999 | Location: | Mansion - First Floor - Breakfast Room (E/R) | Work Type: | Demolition | Notes: | Video and digital photos of plaster walls following removal of wallpaper. No evidence of construction alterations within plaster walls. |
|