Note ID: | JL205 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/26/1999 | Location: | Mansion - First Floor - General | Work Type: | Miscellaneous | Notes: | Video and digital photos of new concrete fill poured into chases cut into original brick walls for new utility lines. Plywood formwork installed on face of brick either side of chase, with opening at top for pouring in concrete. New utility lines encased with concrete within historic brick walls. |
|
|
Note ID: | JL206 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/26/1999 | Location: | Mansion - First Floor - Stair Hall (E/R) | Work Type: | New Finish Application | Notes: | Video and digital photos of plasterer installing finish plaster coat to underside of north stair top run. |
|
|
Note ID: | JL204 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/26/1999 | Location: | Mansion - First Floor - Stair Hall (E/R) | Work Type: | Demolition | Notes: | Video and digital photos of north stair's west wall following removal of canvas wall cover. Now fully exposed is the plaster ghost of a former stair run against the west wall, rising from the floor at the south end to a landing at the north end about where the present landing is located. |
|
|
Note ID: | JL201 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/26/1999 | Location: | Mansion - North Elevation | Work Type: | New Masonry Construction | Notes: | Video and digital photos of concrete block installation at new addition. Exterior block wall has progressed to top of second floor. |
|
|
Note ID: | JL202 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/26/1999 | Location: | Mansion - North Elevation | Work Type: | Miscellaneous | Notes: | Video and digital photos of areaway showing progress of new foundation drainage system. New waterproof membrane and protection drainage mat against building wall, with corrugated, perforated plastic pipe at bottom of gravel fill. |
|
|
Note ID: | JL207 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/26/1999 | Location: | Mansion - Second Floor - Above Ballrooms | Work Type: | Framing | Notes: | Video and digital photos of carpenters installing last of new wood partition frames, and workers installing metal grid for new gypsum board ceilings. |
|
|
Note ID: | JL209 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/26/1999 | Location: | Mansion - Second Floor - Bath #4 (E/R) | Work Type: | Demolition | Notes: | Video and digital photos of chase cut into north original brick wall for plumbing lines. |
No image available
|
|
Note ID: | JL210 | Weather Conditions: | Sunny, low 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/26/1999 | Location: | Mansion - Second Floor - Bath #4 (E/R) | Work Type: | Demolition | Notes: | Video and digital photos of newly exposed existing brick jambs at east and west doors. Existing bricks appear to have been broken to form these openings, which indicates these doors are not original. This adds evidence to the theory that the original north stair was located against the north exterior wall. |
|
|
Note ID: | MS489 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Carriage House - East Elevation | Work Type: | Miscellaneous | Notes: | A large new cooling tower is placed on a pad adjacent to the east end of the Carriage House. |
|
|
Note ID: | MS488 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Carriage House - Lower Floor (east to west) - Room 3 | Work Type: | New Finish Application | Notes: | The new drywall partition in this lower level space is not yet painted. |
|