Governor's Mansion Renovation All Records
|
Note ID: | MS487 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Carriage House - Lower Floor (east to west) - Room 4 | Work Type: | New Finish Application | Notes: | The brick walls have been primed and a drywall ceiling has been installed. Brick patching around the reopened arched doorway is complete. Utilities rough-in appears to be complete. |
|
|
Note ID: | MS485 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Carriage House - Upper Floor (east to west) - Room 10 | Work Type: | New Finish Application | Notes: | The brick walls have been primed and a new drywall ceiling has been installed. Utilities rough-in appears to be nearly complete. |
|
|
Note ID: | MS486 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Carriage House - Upper Floor (east to west) - Room 11 | Work Type: | New Finish Application | Notes: | The brick walls have been primed and a new drywall ceiling has been installed. The new drywall partitions are framed, but the new door opening is not yet cased. |
No image available
|
|
Note ID: | MS483 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Carriage House - Upper Floor (east to west) - Room 7 | Work Type: | New Finish Application | Notes: | The brick walls have been painted and a new wood tongue-and-groove ceiling has been installed and painted. Brick patching around the new through-wall mechanical unit is complete. |
|
|
Note ID: | MS490 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Carriage House - Upper Floor (east to west) - Room 8 | Work Type: | New Finish Application | Notes: | The new drywall partition has been framed in and drywall applied to one side only. Utility rough-in appears to be complete. |
|
|
Note ID: | MS484 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Carriage House - Upper Floor (east to west) - Room 9 | Work Type: | New Finish Application | Notes: | The brick walls have been painted and a new wood tongue-and-groove ceiling has been installed and painted. |
|
|
Note ID: | MS482 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Cottage - East Elevation | Work Type: | Miscellaneous | Notes: | The trench in front of the Cottage (east side) has been filled and the ground leveled. A gravel bed is spread in preparation for the new brick terrace. |
|
|
Note ID: | MS660 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Mansion - Attic | Work Type: | Demolition | Notes: | Attic flooring is being partially removed for installation of sprinkler system. |
No image available
|
|
Note ID: | MS452 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Mansion - Attic | Work Type: | Framing | Notes: | Framing and utilities installation continues in the attic. |
|
|
Note ID: | MS472 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Mansion - Basement - Entrance Hall (A) | Work Type: | Framing | Notes: | First floor framing is being installed in the addition. |
|