Governor's Mansion Renovation All Records
|
Note ID: | MS456 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Mansion - Second Floor - Dressing Room and Bedroom (E) / Governor's Bedroom (R) | Work Type: | Miscellaneous | Notes: | Work continues in the area where the Elevator Foyer will connect to the new Family Room. An existing window opening will be enlarged to create this doorway.
An existing window opening will be closed in where a short hall off the Governor's Bedroom will connect to the new Elevator Foyer. |
|
|
Note ID: | MS455 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Mansion - Second Floor - Dressing Room and Bedroom (E) / Governor's Bedroom (R) | Work Type: | New Finish Application | Notes: | Drywall has been applied to the framing of most new partitions in the Governor's Bedroom. No taping or mudding has been completed in this space. |
|
|
Note ID: | MS462 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Mansion - Second Floor - East Bedroom (E) / First Lady's Dressing and Bathroom (R) | Work Type: | Miscellaneous | Notes: | The tub has been set and the walls are framed for the First Lady's Bathroom. |
|
|
Note ID: | MS659 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Mansion - Second Floor - General | Work Type: | Miscellaneous | Notes: | New bathtubs and "Jacuzzi" whirlpools have been installed throughout the 2nd Floor. |
No image available
|
|
Note ID: | MS459 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Mansion - Second Floor - Private Dining Room, Bathroom, and Powder Room (E) / Bedroom and Bathroom #3 (R) | Work Type: | Miscellaneous | Notes: | Plumbers have installed water supply and drain lines for new Bathroom #3. The tub has been set in place. |
|
|
Note ID: | MS458 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Mansion - Second Floor - Private Dining Room, Bathroom, and Powder Room (E) / Bedroom and Bathroom #3 (R) | Work Type: | Miscellaneous | Notes: | The electricians are wiring Bedroom #3. Framing is complete but there is no drywall yet on the new partition walls. |
|
|
Note ID: | MS481 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Mansion - South Elevation | Work Type: | Miscellaneous | Notes: | The south portico and the associated door casings are being stripped of paint. The portico is enshrouded with polyethylene sheeting. Various chemical and mechanical methods are used to complete the stripping. The contractors prefer using heat guns. A temporary polyethylene "tunnel" helps to control the spread of lead paint fragments or poisonous fumes from the removal process. Workers wear disposable Kevlar or Tyvek suits, hats, gloves, and masks. |
|
|
Note ID: | MS491 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Mansion - West Elevation | Work Type: | Miscellaneous | Notes: | The new foundation drain has been laid on the gravel bed, below the basement floor level. |
|
|
Note ID: | MS480 | Weather Conditions: | Overcast, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/28/1999 | Location: | Site - South Garden | Work Type: | Miscellaneous | Notes: | The garden wall and steps connecting the Mansion to the Cottage and enclosing the West Garden will be restored. The iron railings have been removed for off-site paint removal and repair. The stairs, which are in somewhat poor repair, will be replaced. |
|
|
Note ID: | JL228 | Weather Conditions: | Sunny, high 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/30/1999 | Location: | Carriage House - East Elevation | Work Type: | Excavation | Notes: | Video and digital photos of trench excavation about 8' east of the building's southeast corner. Trench runs north-south to connect a utility pipe from the new outside cooling tower to an underground utility vault along the south side of the driveway. Trench uncovered part of an underground brick foundation wall in line with the existing south wall of the carriage house. Small section of the former brick wall uncovered in the trench appears to be either a T-intersection or corner of the wall. |
|