Pages :   1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125   Previous  Next Page

Note ID: JL218
Weather Conditions: Sunny, high 90s
Report Author: Joseph D. Lahendro
Report Date: 7/30/1999
Location: Mansion - South Elevation
Work Type: Miscellaneous
Notes: Video and digital photos of areaway showing perforated, corrugated plastic foundation drainage pipe at bottom of areaway with gravel fill. Foundation drainage pipe begins at west end of south portico.


Governor's Mansion Renovation Photograph  


Note ID: JL217
Weather Conditions: Sunny, high 90s
Report Author: Joseph D. Lahendro
Report Date: 7/30/1999
Location: Mansion - West Elevation
Work Type: Miscellaneous
Notes: Video and digital photos of areaway south of portico showing new storm water drainage system which begins at southwest corner of house. New brass drain cover shows level of brick pavers to be installed. Route of new electrical conduits, mentioned above, is evident. Electricians are tying together conduits into bundles for sliding under portico.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  
Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: JL216
Weather Conditions: Sunny, high 90s
Report Author: Joseph D. Lahendro
Report Date: 7/30/1999
Location: Mansion - West Elevation
Work Type: Miscellaneous
Notes: Video and digital photos of areaway showing new 8" PVC storm water drainage line connected to downspouts and condensate lines. Will drain to an inlet at the northeast corner of the house and then into existing storm water line in Governor St. The new drainage line will be covered with gravel to about 1' below basement window sills, and then will be covered with filter fabric, sand and brick pavers. About 30 new electrical conduits are stubbed out of the north wall into the areaway just north of the portico. These conduits will extend into the areaway running south below the portico, within the gravel fill, and into the existing underground tunnel at the southeast corner.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  
Governor's Mansion Renovation Photograph  


Note ID: MS514
Weather Conditions: Partly cloudy, high 80s
Report Author: Mary Harding Sadler
Report Date: 8/2/1999
Location: Cottage - Second Floor - Bath (E/R)
Work Type: New Finish Application
Notes: Ceramic tile floors and base have been installed in the 2nd floor Bathroom of the Cottage.


Governor's Mansion Renovation Photograph  


Note ID: MS512
Weather Conditions: Partly cloudy, high 80s
Report Author: Mary Harding Sadler
Report Date: 8/2/1999
Location: Mansion - Attic
Work Type: Miscellaneous
Notes: Framing and utilities installation continue in the attic.


Governor's Mansion Renovation Photograph  


Note ID: MS498
Weather Conditions: Partly cloudy, high 80s
Report Author: Mary Harding Sadler
Report Date: 8/2/1999
Location: Mansion - Basement - Entrance Hall (A)
Work Type: Framing
Notes: Scaffolding is set inside the new addition in preparation for framing.


Governor's Mansion Renovation Photograph  


Note ID: MS496
Weather Conditions: Partly cloudy, high 80s
Report Author: Mary Harding Sadler
Report Date: 8/2/1999
Location: Mansion - Basement - Hall (E) / Service Hall (R)
Work Type: New Finish Application
Notes: The grid for a suspended acoustical tile ceiling is complete in the Service Hall. The new brick-shaped terra cotta tile floor has been installed in a herringbone pattern.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: MS497
Weather Conditions: Partly cloudy, high 80s
Report Author: Mary Harding Sadler
Report Date: 8/2/1999
Location: Mansion - Basement - Kitchen (E/R)
Work Type: New Finish Application
Notes: Drywall has been installed on kitchen walls and all utilities have been roughed in. Tile and thin-set materials are stacked in the kitchen in preparation for installation.


Governor's Mansion Renovation Photograph  


Note ID: MS517
Weather Conditions: Partly cloudy, high 80s
Report Author: Mary Harding Sadler
Report Date: 8/2/1999
Location: Mansion - East Elevation
Work Type: New Masonry Construction
Notes: The former service door on the east side of the Kitchen has been infilled with concrete block. A utilities yard will be enclosed near this former opening.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: MS503
Weather Conditions: Partly cloudy, high 80s
Report Author: Mary Harding Sadler
Report Date: 8/2/1999
Location: Mansion - First Floor - Beverage Service (E/R)
Work Type: Miscellaneous
Notes: The mechanical unit has been set in the ceiling of the Beverage Service area and the ductwork has been insulated. The walls show evidence of earlier channeling in the brick walls to recess utility lines.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  

Pages :   1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125   Previous  Next Page

facebook twitter youtube instagram linkedin