Note ID: | JL218 | Weather Conditions: | Sunny, high 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/30/1999 | Location: | Mansion - South Elevation | Work Type: | Miscellaneous | Notes: | Video and digital photos of areaway showing perforated, corrugated plastic foundation drainage pipe at bottom of areaway with gravel fill. Foundation drainage pipe begins at west end of south portico. |
|
|
Note ID: | JL217 | Weather Conditions: | Sunny, high 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/30/1999 | Location: | Mansion - West Elevation | Work Type: | Miscellaneous | Notes: | Video and digital photos of areaway south of portico showing new storm water drainage system which begins at southwest corner of house. New brass drain cover shows level of brick pavers to be installed. Route of new electrical conduits, mentioned above, is evident. Electricians are tying together conduits into bundles for sliding under portico. |
|
|
Note ID: | JL216 | Weather Conditions: | Sunny, high 90s | Report Author: | Joseph D. Lahendro | Report Date: | 7/30/1999 | Location: | Mansion - West Elevation | Work Type: | Miscellaneous | Notes: | Video and digital photos of areaway showing new 8" PVC storm water drainage line connected to downspouts and condensate lines. Will drain to an inlet at the northeast corner of the house and then into existing storm water line in Governor St. The new drainage line will be covered with gravel to about 1' below basement window sills, and then will be covered with filter fabric, sand and brick pavers. About 30 new electrical conduits are stubbed out of the north wall into the areaway just north of the portico. These conduits will extend into the areaway running south below the portico, within the gravel fill, and into the existing underground tunnel at the southeast corner. |
|
|
Note ID: | MS514 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Cottage - Second Floor - Bath (E/R) | Work Type: | New Finish Application | Notes: | Ceramic tile floors and base have been installed in the 2nd floor Bathroom of the Cottage. |
|
|
Note ID: | MS512 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - Attic | Work Type: | Miscellaneous | Notes: | Framing and utilities installation continue in the attic. |
|
|
Note ID: | MS498 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - Basement - Entrance Hall (A) | Work Type: | Framing | Notes: | Scaffolding is set inside the new addition in preparation for framing. |
|
|
Note ID: | MS496 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - Basement - Hall (E) / Service Hall (R) | Work Type: | New Finish Application | Notes: | The grid for a suspended acoustical tile ceiling is complete in the Service Hall. The new brick-shaped terra cotta tile floor has been installed in a herringbone pattern. |
|
|
Note ID: | MS497 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - Basement - Kitchen (E/R) | Work Type: | New Finish Application | Notes: | Drywall has been installed on kitchen walls and all utilities have been roughed in. Tile and thin-set materials are stacked in the kitchen in preparation for installation. |
|
|
Note ID: | MS517 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - East Elevation | Work Type: | New Masonry Construction | Notes: | The former service door on the east side of the Kitchen has been infilled with concrete block. A utilities yard will be enclosed near this former opening. |
|
|
Note ID: | MS503 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - First Floor - Beverage Service (E/R) | Work Type: | Miscellaneous | Notes: | The mechanical unit has been set in the ceiling of the Beverage Service area and the ductwork has been insulated. The walls show evidence of earlier channeling in the brick walls to recess utility lines. |
|