Note ID: | MS515 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - First Floor - General | Work Type: | New Finish Application | Notes: | A sample of the graining for the historic first floor doors has been prepared for the Architect's approval. The faux finish specialist, Elaine Hamilton has added a glaze to the finish that has improved the quality of the sample. |
|
|
Note ID: | MS500 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - First Floor - Ladies Parlor (E/R) | Work Type: | Miscellaneous | Notes: | Canvas is gradually removed from the walls of the Ladies Parlor. |
|
|
Note ID: | MS502 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - First Floor - North Foyer (E/R) | Work Type: | Miscellaneous | Notes: | The channels cut into the masonry walls have been filled with ready-mix concrete. Formwork has been removed. |
|
|
Note ID: | MS501 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - First Floor - Old Governor's Office (E/R) | Work Type: | Miscellaneous | Notes: | The doors in the Old Governor's Office have been removed to be grained. The channels cut in the brick walls are being filled with ready-mix concrete once the utility lines are installed. |
|
|
Note ID: | MS504 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - First Floor - Scullery (E/R) | Work Type: | Framing | Notes: | The original rear wall of the Mansion, exposed in the Scullery, has been furred out with steel studs in preparation for a drywall finish. |
|
|
Note ID: | MS516 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - North Elevation | Work Type: | On-site paint removal | Notes: | The North Portico has been temporarily tented with polyethylene during the paint removal process. A variety of products and methods are used to remove paint. The workers' preference is to use heat guns. When paint is removed from the stone string course extensive concrete patches are revealed. |
|
|
Note ID: | MS499 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - North Elevation | Work Type: | New Masonry Construction | Notes: | Scaffolding remains at the exterior of the new addition twhile installation brick veneer continues. A new foundation drain extends from the north wall of the Mansion to the edge of the new addition. |
|
|
Note ID: | MS513 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - Second Floor - Above Ballrooms | Work Type: | Miscellaneous | Notes: | The focus of Electricians' work has moved to the 2nd floor in the area over the North and South Ballrooms. |
|
|
Note ID: | MS509 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - Second Floor - Bedroom and Bathroom #2 (R) | Work Type: | Framing | Notes: | It appears that framing in Bedroom #2 cannot be completed until the utilities are roughed in. After the door frames and casings are removed from the 2 Library doors there is additional proof that this wall (the south wall of Bedroom #2) was an exterior wall prior to the construction of the library/breakfast room addition. It now seems certain that there was an L-shaped connector linking the original Mansion to the 1906 wing (matching the brick connector recently demolished on the north side). |
|
|
Note ID: | MS511 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - Second Floor - Capitol Room (E/R) | Work Type: | Framing | Notes: | The doorway leading from the Capitol Room into the First Family's private quarters has been reduced in size with wood framing. |
|