Note ID: | JL238 | Weather Conditions: | Sunny, mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 8/4/1999 | Location: | Mansion - West Elevation | Work Type: | Demolition | Notes: | Video and digital photos of newly installed scaffolding with workers removing second floor window shutters and sash. |
|
|
Note ID: | MS519 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Carriage House - North Elevation | Work Type: | Miscellaneous | Notes: | Masonry repairs on the Carriage House exterior have been completed with brick salvaged from the building and Portland cement mortar. |
|
|
Note ID: | MS518 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Carriage House - Upper Floor (east to west) - Room 9 | Work Type: | New Finish Application | Notes: | Painters have begun to prime the interior walls and trim of the upper level of the Carriage House. |
|
|
Note ID: | MS536 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - Basement - Entrance Hall (A) | Work Type: | Framing | Notes: | Floor framing has been installed in the new addition. Masonry openings in the new addition have acquired definition. The opening in the original east wall (northeast corner) between the elevator and the Machine Room is still rough. |
|
|
Note ID: | MS535 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - Basement - Kitchen (E/R) | Work Type: | New Finish Application | Notes: | New floor and wall finish materials are stored in the Kitchen and new kitchen equipment and appliances have begun to arrive. |
|
|
Note ID: | MS537 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - East Elevation | Work Type: | New Masonry Construction | Notes: | New brick veneer is being installed on the east and north sides of the new addition. It has reached the level of the basement floor. New brick veneer has been applied to the concrete block filling the former service entry. The brick is a new dark red brick set with Portland cement mortar. The brick is a good match for the size and texture of the historic brick. |
|
|
Note ID: | MS524 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - First Floor - Dining Room (E/R) | Work Type: | Miscellaneous | Notes: | The Dining Room is being used to store new and salvaged wood trim. |
|
|
Note ID: | MS522 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - First Floor - Entrance Hall (E/R) | Work Type: | Miscellaneous | Notes: | Wall canvas has been stripped from the Entrance Hall revealing a dark olive paint color on the plaster walls. |
|
|
Note ID: | MS521 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - First Floor - Ladies Parlor (E/R) | Work Type: | Miscellaneous | Notes: | Wall canvas has been completely removed from the Ladies Parlor. Samples of a stripped historic window sash and a historic door have been placed in the room for review. |
|
|
Note ID: | MS523 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - First Floor - Old Governor's Office (E/R) | Work Type: | Miscellaneous | Notes: | Wall canvas has been stripped from the walls of the Old Governor's Office. The remnants of the drywall and furring have been removed from the walls flanking the mantel revealing intact plaster cornices. An ornamental brass coal grate is sitting in the firebox. |
|