Governor's Mansion Renovation All Records
|
Note ID: | MS530 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - Second Floor - Above Ballrooms | Work Type: | New Finish Application | Notes: | Drywall has been installed in the corridor over the South Ballroom that connects the First Family's bedrooms. |
|
|
Note ID: | MS528 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - Second Floor - Above Ballrooms | Work Type: | New Finish Application | Notes: | The new partitions in the 2nd floor area over the North and South Ballrooms have been drywalled. |
|
|
Note ID: | MS532 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - Second Floor - Bedroom and Bathroom #2 (R) | Work Type: | New Finish Application | Notes: | The new partition wall in Bedroom #2 has been drywalled |
|
|
Note ID: | MS527 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - Second Floor - Capitol Room (E/R) | Work Type: | New Finish Application | Notes: | Drywall has been laminated to the ceiling of the Capitol Room. Drywall has also been installed at the reduced doorway into the First Family's private quarters. |
|
|
Note ID: | MS533 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - Second Floor - Dressing Room and Bedroom (E) / Governor's Bedroom (R) | Work Type: | New Finish Application | Notes: | Few new finishes or drywall have been installed in the new Governor's Bedroom. The former window opening has not been closed in, nor has the window opening now opening into the Family Kitchen been framed in. |
|
|
Note ID: | MS534 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - Second Floor - East Bedroom (E) / First Lady's Dressing and Bathroom (R) | Work Type: | Framing | Notes: | Framing for the First Lady's Dressing Room has not been drywalled, though utilities have been roughed in. |
|
|
Note ID: | MS520 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - Second Floor - General | Work Type: | Window Conservation | Notes: | Historic windows from the west side of the 2nd floor have been stripped of paint, putty, and glazing and repaired. A sample of a repaired sash has been brought on site for review and approval. |
|
|
Note ID: | MS525 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - Second Floor - Lafayette Room (E/R) | Work Type: | Miscellaneous | Notes: | Drywall has been laminated to the ceiling of the Lafayette Bedroom. Very old flooring uncovered in the closet on the south side of the fireplace evidences that the closet was probably once a doorway into the bedroom from an early Stairhall. This theory is supported by evidence of an early stair (west wall of the North Foyer) whose landing was further north than the present landing of the North Stair. The brick wall adjacent to the bedroom door is channeled in order to recess utility lines. |
|
|
Note ID: | MS529 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - Second Floor - Northeast Bedroom and Bath (E) / Family Room (R) | Work Type: | New Finish Application | Notes: | The new partitions in the Family Room have not been drywalled. Neither the ceiling nor the historic brick walls have been drywalled. The window opening has not yet been enlarged. The room is being used to store floor framing for the new addition. |
|
|
Note ID: | MS526 | Weather Conditions: | Partly cloudy, high 80s. | Report Author: | Mary Harding Sadler | Report Date: | 8/6/1999 | Location: | Mansion - Second Floor - Old Governor's Bedroom (E/R) | Work Type: | Miscellaneous | Notes: | Drywall has been laminated to the ceiling of the Old Governor's Bedroom. Brick wall adjacent to the bedroom door is channeled in order to recess utility lines. |
|