Note ID: | JL285 | Weather Conditions: | Sunny, mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 8/19/1999 | Location: | Mansion - First Floor - Beverage Service (E/R) | Work Type: | Demolition | Notes: | Video and digital photos of north wall where the window and brick below have been removed to create new doorway. Mason installing new brick jambs for door. Mechanic installing pipe insulation for new HVAC system. Existing pocket door, retracted into its pocket, is exposed by removal of finishes. |
|
|
Note ID: | JL282 | Weather Conditions: | Sunny, mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 8/19/1999 | Location: | Mansion - First Floor - Old Governor's Office (E/R) | Work Type: | New Finish Application | Notes: | Video and digital photos of newly installed east wall wainscot reusing salvaged wainscot from north stair floor. |
|
|
Note ID: | JL283 | Weather Conditions: | Sunny, mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 8/19/1999 | Location: | Mansion - First Floor - Old Governor's Office (E/R) | Work Type: | New Finish Application | Notes: | Video and digital photos of new baseboard installed in northwest and southwest corners. |
|
|
Note ID: | JL284 | Weather Conditions: | Sunny, mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 8/19/1999 | Location: | Mansion - First Floor - Stair Hall (E/R) | Work Type: | New Finish Application | Notes: | Video and digital photos of new baseboard on north, south and west walls. |
|
|
Note ID: | JL278 | Weather Conditions: | Sunny, mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 8/19/1999 | Location: | Mansion - North Elevation | Work Type: | New Masonry Construction | Notes: | Video and digital photos of newly installed brick veneer on new addition. Almost completed. |
|
|
Note ID: | JL286 | Weather Conditions: | Sunny, mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 8/19/1999 | Location: | Mansion - Second Floor - Elevator Foyer (A) | Work Type: | Demolition | Notes: | Video and digital photos of wood eave on west wall now enclosed by new addition. The modillion blocks at the eave have been removed and are still on-site available for inspection. Modillions were nailed from backside of fascia and soffit boards with long, early cut nails now greatly distorted due to soft metal. Appears to be original. Lintel at window below this eave is not stone, but is stucco (typical for second floor windows, east side windows, or replacment windows?). Window's sill is stone. |
|
|
Note ID: | JL287 | Weather Conditions: | Sunny, mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 8/19/1999 | Location: | Mansion - Second Floor - General | Work Type: | New Finish Application | Notes: | Video of general views of construction progress in family's residential area. Carpenter isntalling new baseboard. Millwork installation is about 65% complete. |
|
|
Note ID: | JL279 | Weather Conditions: | Sunny, mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 8/19/1999 | Location: | Mansion - South Elevation | Work Type: | New Masonry Construction | Notes: | Video and digital photos of new masonry support walls for replacement stair on west side of elevated walkway. New support walls will hold new stone treads and risers. |
|
|
Note ID: | JL280 | Weather Conditions: | Sunny, mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 8/19/1999 | Location: | Mansion - South Elevation | Work Type: | On-site paint removal | Notes: | Video and digital photos of laborer performing final paint removal on south portico woodwork, following bulk removal of paint using heat gun. Final paint removal process begins with application of chemical stripper, which is allowed to work for a few minutes before removing loosen paint with steel wool. Area is rinsed with water and allowed to dry. |
|
|
Note ID: | JL281 | Weather Conditions: | Sunny, mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 8/19/1999 | Location: | Mansion - West Elevation | Work Type: | On-site paint removal | Notes: | Video and digital photos of brick façade covered with plastic tent over the scaffolding. Tent will be used to enclose power stripping of façade brick paint. |
|