Governor's Mansion Renovation All Records
|
Note ID: | MS588 | Weather Conditions: | Partly cloudy, mid-80s | Report Author: | Mary Harding Sadler | Report Date: | 8/24/1999 | Location: | Mansion - First Floor - General | Work Type: | Miscellaneous | Notes: | New poplar baseboard is being installed in most of the first floor. At the new diffusers below the windows the baseboard is pulled forward, in front of the diffuser, in order to minimize the impact of the new mechanical system. The new baseboard dimensions and profiles match the historic baseboard dimensions and profiles. |
|
|
Note ID: | MS585 | Weather Conditions: | Partly cloudy, mid-80s | Report Author: | Mary Harding Sadler | Report Date: | 8/24/1999 | Location: | Mansion - First Floor - Ladies Parlor (E/R) | Work Type: | New Finish Application | Notes: | A sample finished door has been brought to the Mansion for review and approval. |
|
|
Note ID: | MS589 | Weather Conditions: | Partly cloudy, mid-80s | Report Author: | Mary Harding Sadler | Report Date: | 8/24/1999 | Location: | Mansion - First Floor - North Ballroom (E/R) | Work Type: | Miscellaneous | Notes: | New wood windows (for the new addition) have arrived and are being stored in the North Ballroom. The new windows closely match the appearance and configuration of the historic windows. |
|
|
Note ID: | MS587 | Weather Conditions: | Partly cloudy, mid-80s | Report Author: | Mary Harding Sadler | Report Date: | 8/24/1999 | Location: | Mansion - First Floor - Old Governor's Office (E/R) | Work Type: | Miscellaneous | Notes: | New poplar baseboard is being installed in the Old Governor's Office. At the new diffusers below the windows the baseboard is pulled forward, in front of the diffuser, in order to minimize the visual impact of the new mechanical system. The new baseboard dimensions and profiles match the historic baseboard dimensions and profiles. |
|
|
Note ID: | MS586 | Weather Conditions: | Partly cloudy, mid-80s | Report Author: | Mary Harding Sadler | Report Date: | 8/24/1999 | Location: | Mansion - First Floor - Old Governor's Office (E/R) | Work Type: | Miscellaneous | Notes: | The historic wainscot salvaged from the Stairhall subfloor has been patched and reinstalled on either side of the door leading from the Old Governor's Office into the North Foyer. |
|
|
Note ID: | MS578 | Weather Conditions: | Partly cloudy, mid-80s | Report Author: | Mary Harding Sadler | Report Date: | 8/24/1999 | Location: | Mansion - North Elevation | Work Type: | Framing | Notes: | Roof framing of the new addition has begun. |
|
|
Note ID: | MS577 | Weather Conditions: | Partly cloudy, mid-80s | Report Author: | Mary Harding Sadler | Report Date: | 8/24/1999 | Location: | Mansion - North Elevation | Work Type: | On-site paint removal | Notes: | Paint removal on the North Portico has begun in earnest, now that the process is complete on the South Portico. |
|
|
Note ID: | MS595 | Weather Conditions: | Partly cloudy, mid-80s | Report Author: | Mary Harding Sadler | Report Date: | 8/24/1999 | Location: | Mansion - Second Floor - Dressing Room and Bedroom (E) / Governor's Bedroom (R) | Work Type: | Miscellaneous | Notes: | In the Governor's Bedroom drywall has been installed, as have ceiling "can lights." The new baseboard has been installed and outlets are being wired. Finish carpenters are fitting a simple crown molding at the joint between ceiling and walls. |
|
|
Note ID: | MS592 | Weather Conditions: | Partly cloudy, mid-80s | Report Author: | Mary Harding Sadler | Report Date: | 8/24/1999 | Location: | Mansion - Second Floor - Elevator Foyer (A) | Work Type: | Framing | Notes: | Framing and roof sheathing are nearing completion in the Elevator Foyer. |
|
|
Note ID: | MS593 | Weather Conditions: | Partly cloudy, mid-80s | Report Author: | Mary Harding Sadler | Report Date: | 8/24/1999 | Location: | Mansion - Second Floor - Lafayette Room (E/R) | Work Type: | Miscellaneous | Notes: | South brick wall in the Lafayette Room is channeled to conceal new electrical conduit. |
|