Note ID: | MS616 | Weather Conditions: | partly cloudy, low 80s | Report Author: | Mary Harding Sadler | Report Date: | 9/7/1999 | Location: | Mansion - West Elevation | Work Type: | On-site paint removal | Notes: | Paint removal continues on the exterior. A temporary polyethylene curtain protects the façade and a polyethylene gutter lines the areaway so that toxic runoff from the cleaning process can be contained and controlled. Detail work has begun on the Entry (west) Portico. |
|
|
Note ID: | MS619 | Weather Conditions: | partly cloudy, low 80s | Report Author: | Mary Harding Sadler | Report Date: | 9/7/1999 | Location: | Mansion - West Elevation | Work Type: | Miscellaneous | Notes: | Shutters have been removed from the Mansion during the paint removal process. They will be reinstalled after the Mansion exterior has been repainted. |
|
|
Note ID: | MS618 | Weather Conditions: | partly cloudy, low 80s | Report Author: | Mary Harding Sadler | Report Date: | 9/7/1999 | Location: | Site - West Garden | Work Type: | New Concrete Construction | Notes: | A foundation has been poured for the new Guard House. |
|
|
Note ID: | JL313 | Weather Conditions: | Sunny, mid 70s | Report Author: | Joseph D. Lahendro | Report Date: | 9/11/1999 | Location: | Cottage - East Elevation | Work Type: | New Masonry Construction | Notes: | Video and digital photos of masons installing new brick paving at terrace east of cottage. Using full size brick in running bond pattern on sand setting bed over a concrete slab. The bricks are butted tightly together and sand is swept over them to fill any open joints between the brick. |
|
|
Note ID: | JL317 | Weather Conditions: | Sunny, mid 70s | Report Author: | Joseph D. Lahendro | Report Date: | 9/11/1999 | Location: | Mansion - Basement - Elevator (E) | Work Type: | Demolition | Notes: | Video and digital photos of west wall of elevator shaft (outside face of original rear wall) showing removal of projecting face of stone belt course and brick below, shaved off to provide clearance for elevator equipment. |
|
|
Note ID: | JL318 | Weather Conditions: | Sunny, mid 70s | Report Author: | Joseph D. Lahendro | Report Date: | 9/11/1999 | Location: | Mansion - Basement - Kitchen (E/R) | Work Type: | Miscellaneous | Notes: | Video and digital photos of electricians installing new wiring. |
|
|
Note ID: | JL320 | Weather Conditions: | Sunny, mid 70s | Report Author: | Joseph D. Lahendro | Report Date: | 9/11/1999 | Location: | Mansion - First Floor - Entrance Hall (E/R) | Work Type: | New Finish Application | Notes: | Video of sample paint color schemes. |
No image available
|
|
Note ID: | JL319 | Weather Conditions: | Sunny, mid 70s | Report Author: | Joseph D. Lahendro | Report Date: | 9/11/1999 | Location: | Mansion - First Floor - Ladies Parlor (E/R) | Work Type: | Miscellaneous | Notes: | Video and digital photos of carpenter installing a dutchman in the south jamb of the north door on the east wall. Dutchman infills prior damage created by drilling large holes for this door's former use as a display cabinet. |
|
|
Note ID: | JL322 | Weather Conditions: | Sunny, mid 70s | Report Author: | Joseph D. Lahendro | Report Date: | 9/11/1999 | Location: | Mansion - First Floor - North Ballroom (E/R) | Work Type: | Miscellaneous | Notes: | Video and digital photos of carpenter repairing and reinstalling original chairrail in the north window recess, following replacement of damaged wood panels. |
|
|
Note ID: | JL321 | Weather Conditions: | Sunny, mid 70s | Report Author: | Joseph D. Lahendro | Report Date: | 9/11/1999 | Location: | Mansion - First Floor - Old Governor's Office (E/R) | Work Type: | New Finish Application | Notes: | Video and digital photos of carpet samples with sample paint schemes. |
|