Governor's Mansion Renovation All Records
|
Note ID: | MS671 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Mansion - First Floor - Old Governor's Office (E/R) | Work Type: | Miscellaneous | Notes: | Millwork built to contain the floor diffusers feeding the 1st Floor rooms is complete. This widened section of baseboard also holds electrical outlets. |
|
|
Note ID: | MS674 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Mansion - First Floor - Scullery (E/R) | Work Type: | Miscellaneous | Notes: | Finish carpenter Arthur Woodward solves the puzzle of reusing the threshold and hinge in the modified doorway connecting the Breakfast Room to the Scullery. In the Scullery, drywall has been installed, as has the dumbwaiter. The ceiling has not been installed so that there will be easy access to the utilities. |
|
|
Note ID: | MS692 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Mansion - First Floor - Stair Hall (E/R) | Work Type: | New Finish Application | Notes: | Clean-up and testing of possible paint colors is ongoing on the ground floor. |
|
|
Note ID: | MS662 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Mansion - North Elevation | Work Type: | On-site paint removal | Notes: | Paint removal on the North Portico, and on the north elevation as a whole, appears to be complete. A new column base is being milled to replace the rotted base at the portico's northeast corner. |
|
|
Note ID: | MS689 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Mansion - Second Floor - Bedroom and Bathroom #2 (R) | Work Type: | New Finish Application | Notes: | The walls of Bedroom #2 have been primed with a Wedgewood blue paint. Doors, casing, trim, and ceiling are painted cream. |
|
|
Note ID: | MS686 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Mansion - Second Floor - Bedroom and Bathroom #2 (R) | Work Type: | New Finish Application | Notes: | A water proofing compound has been spread on the Bathroom #3 floor prior to installation of the new ceramic tile. |
|
|
Note ID: | MS684 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Mansion - Second Floor - Dressing Room and Bedroom (E) / Governor's Bedroom (R) | Work Type: | New Finish Application | Notes: | Re-milled, quarter-sawn, heart pine from Mountain Lumber has been delivered to the site for installation on the 2nd floor in the First Family's Private Quarters. |
|
|
Note ID: | MS685 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Mansion - Second Floor - East Bedroom (E) / First Lady's Dressing and Bathroom (R) | Work Type: | New Finish Application | Notes: | A water proofing compound has been spread on the First Lady's Bathroom floor prior to installation of the new ceramic tile. |
|
|
Note ID: | MS687 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Mansion - Second Floor - Elevator Foyer (A) | Work Type: | Miscellaneous | Notes: | The doorway connecting the Elevator Foyer to the new Family Room is being cased with trim to match historic trim typical on the 2nd floor. |
|
|
Note ID: | MS688 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Mansion - Second Floor - Family Kitchen (A) | Work Type: | Framing | Notes: | The window that formerly opened from the north wall of the Governor's Bedroom has been framed over, because this wall will be shared with the new Family Kitchen. |
|