Governor's Mansion Renovation All Records
|
Note ID: | JL333 | Weather Conditions: | Sunny low 80s | Report Author: | Joseph D. Lahendro | Report Date: | 9/25/1999 | Location: | Mansion - West Elevation | Work Type: | Framing | Notes: | Video and digital photos of new guard station with carpenters building wood frame. Electrical rough-in is completed. |
No image available
|
|
Note ID: | JL326 | Weather Conditions: | Sunny low 80s | Report Author: | Joseph D. Lahendro | Report Date: | 9/25/1999 | Location: | Mansion - West Elevation | Work Type: | Miscellaneous | Notes: | Video and digital photos of first floor window at south end where stone sill has been newly patched with Abitron patching compound. All stone window elements (sill and lintel) will be painted because of the prior patching. |
|
|
Note ID: | JL325 | Weather Conditions: | Sunny low 80s | Report Author: | Joseph D. Lahendro | Report Date: | 9/25/1999 | Location: | Mansion - West Elevation | Work Type: | On-site paint removal | Notes: | Video and digital photos of brick façade following paint removal. Workman removing paint from window frames. |
|
|
Note ID: | JL334 | Weather Conditions: | Sunny low 80s | Report Author: | Joseph D. Lahendro | Report Date: | 9/25/1999 | Location: | Mansion - West Elevation | Work Type: | Framing | Notes: | Video and digital photos of new guard station with carpenters building wood frame. Electrical rough-in is completed. |
|
|
Note ID: | JL335 | Weather Conditions: | Sunny low 80s | Report Author: | Joseph D. Lahendro | Report Date: | 9/25/1999 | Location: | Mansion - West Elevation | Work Type: | New Finish Application | Notes: | Video and digital photos of newly painted brick façade. Window frames have been prime painted. Stone window lintels have been finish painted, but stone sills and belt course have not yet been painted. |
|
|
Note ID: | JL356 | Weather Conditions: | Cloudy, low 70's | Report Author: | Joseph D. Lahendro | Report Date: | 9/29/1999 | Location: | Mansion - Basement - Hall (E) / Stairhall (R) | Work Type: | Miscellaneous | Notes: | Video and digital photos of carpenter dismantling north stair to rebuild loose elements and extend stair to new lower floor level. Newel removed to be reused at new bottom step. Handrail will be replaced. All nails in newel post, pickets, nosing returns are wire nails, and appears to be 20th century construction. |
|
|
Note ID: | JL355 | Weather Conditions: | Cloudy, low 70's | Report Author: | Joseph D. Lahendro | Report Date: | 9/29/1999 | Location: | Mansion - East Elevation | Work Type: | New Masonry Construction | Notes: | Video and digital photos of new brick wall, partially constructed, created to hide kitchen equipment and new ductwork coming out of basement wall. |
|
|
Note ID: | JL359 | Weather Conditions: | Cloudy, low 70's | Report Author: | Joseph D. Lahendro | Report Date: | 9/29/1999 | Location: | Mansion - First Floor - Dining Room (E/R) | Work Type: | Demolition | Notes: | Video and digital photos of plaster walls following removal of painter's canvas. Ghosts on east wall plaster surface indicate outline of original mantle and overmantle removed in mid-20th century. Plaster infill indicates original mantle was about 7'-11" wide and 5'-8" tall. Overmantle appears to have started above the former mantle, was the same width as mantle, and extended to about 9'-10" above the floor. See sketch. |
|
|
Note ID: | JL358 | Weather Conditions: | Cloudy, low 70's | Report Author: | Joseph D. Lahendro | Report Date: | 9/29/1999 | Location: | Mansion - First Floor - North Ballroom (E/R) | Work Type: | New Finish Application | Notes: | Video and digital photos of east door to new elevator addition, that used to be a window. Carpenter is installing new moldings due to converted use, and is replacing deteriorated elements. Salvaged sash, with mirrors replacing former glass panes, installed in frame above door to retain original opening proportion. |
|
|
Note ID: | JL360 | Weather Conditions: | Cloudy, low 70's | Report Author: | Joseph D. Lahendro | Report Date: | 9/29/1999 | Location: | Mansion - First Floor - Scullery (E/R) | Work Type: | New Finish Application | Notes: | Video and digital photos of newly installed quarry tile flooring over previously installed waterproofing membrane on plywood subfloor. |
|