Note ID: | MS193 | Weather Conditions: | Partly cloudy, mid-80's | Report Author: | Mary Harding Sadler | Report Date: | 5/22/1999 | Location: | Mansion - Second Floor - Above Ballrooms | Work Type: | Demolition | Notes: | Cellulose insulation held between ceiling joists by cardboard panels fills the air. Demolition of partitions and finishes continues in the 2nd floor spaces over the North and South Ballrooms. |
|
|
Note ID: | MS194 | Weather Conditions: | Partly cloudy, mid-80's | Report Author: | Mary Harding Sadler | Report Date: | 5/22/1999 | Location: | Mansion - Second Floor - Dressing Room and Bedroom (E) / Governor's Bedroom (R) | Work Type: | Demolition | Notes: | Flooring and other materials are being removed from the former Governor's Bedroom, by way of a chute set up outside an east-facing window. There is still concern about the framing conditions where the elevator was removed and the shaft demolished. Some floor joists have already been supplemented with new framing, through-bolted to the existing joists. |
|
|
Note ID: | MS207 | Weather Conditions: | stormy, low 60's | Report Author: | Mary Harding Sadler | Report Date: | 5/24/1999 | Location: | Mansion - Attic | Work Type: | Demolition | Notes: | Attic continues to be cleared of debris. Original framing is increasingly exposed. |
|
|
Note ID: | MS210 | Weather Conditions: | stormy, low 60's | Report Author: | Mary Harding Sadler | Report Date: | 5/24/1999 | Location: | Mansion - Basement - General | Work Type: | New Concrete Construction | Notes: | Gravel was delivered into the basement, through windows on the west side (front). Gravel is being spread throughout the basement in preparation for pouring the new concrete slab. The slab installer is "shooting" levels, using a laser device, at the perimeter of each space to set the level for the new slab. A synthetic expansion joint is nailed to walls at the perimeter of each space. |
|
|
Note ID: | MS212 | Weather Conditions: | stormy, low 60's | Report Author: | Mary Harding Sadler | Report Date: | 5/24/1999 | Location: | Mansion - Basement - Kitchen (E/R) | Work Type: | Demolition | Notes: | The last of the old ceramic tile is mechanically knocked off the kitchen walls. |
|
|
Note ID: | MS211 | Weather Conditions: | stormy, low 60's | Report Author: | Mary Harding Sadler | Report Date: | 5/24/1999 | Location: | Mansion - Basement - Kitchen Service Area (E) / Serving Scullery (R) | Work Type: | Demolition | Notes: | The last of the old elevator, its cast concrete pit, is removed with a jack hammer. |
|
|
Note ID: | MS209 | Weather Conditions: | stormy, low 60's | Report Author: | Mary Harding Sadler | Report Date: | 5/24/1999 | Location: | Mansion - Basement - Laundry (E) | Work Type: | Demolition | Notes: | Granite threshold from west wall of former Laundry Room is stored in lower level of the connector between the Mansion and the Cottage. |
|
|
Note ID: | MS208 | Weather Conditions: | stormy, low 60's | Report Author: | Mary Harding Sadler | Report Date: | 5/24/1999 | Location: | Mansion - First Floor - Dining Room (E/R) | Work Type: | Floor Conservation | Notes: | Radiused patches in the border of the Dining Room floor have been installed. Stains remain for later treatment. |
|
|
Note ID: | MS203 | Weather Conditions: | stormy, low 60's | Report Author: | Mary Harding Sadler | Report Date: | 5/24/1999 | Location: | Mansion - Second Floor - Above Ballrooms | Work Type: | Demolition | Notes: | In the entire 2nd floor area above the Ballrooms the top layer of flooring is being removed, revealing the numerous changes to partition layouts in this area of the 2nd floor. |
|
|
Note ID: | MS205 | Weather Conditions: | stormy, low 60's | Report Author: | Mary Harding Sadler | Report Date: | 5/24/1999 | Location: | Mansion - Second Floor - Dressing Room and Bedroom (E) / Governor's Bedroom (R) | Work Type: | Demolition | Notes: | Removal of cellulose insulation held between joists with cardboard panels. |
|