Note ID: | MS447 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Carriage House - Lower Floor (east to west) - Room 1 | Work Type: | New Finish Application | Notes: | New drywall has been installed on new frame partitions in the lower level of the Carriage House. Drywall has been taped and mudded. Casings have not been installed on doorways. |
|
|
Note ID: | MS446 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Carriage House - Upper Floor (east to west) - Room 7 | Work Type: | New Finish Application | Notes: | Exposed brick walls have been primed and new beaded tongue-and-groove wood ceilings have been installed in the upper level of the Carriage House. Drywall has been taped and mudded. Casings have not been installed on doorways. |
|
|
Note ID: | MS445 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Cottage - East Elevation | Work Type: | Miscellaneous | Notes: | New utility lines are being installed in a trench along the east front of the Cottage. |
|
|
Note ID: | MS429 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Attic | Work Type: | Demolition | Notes: | Demolition of parts of the brick chimney masses is necessary to create new doorways which will provide access to the attic perimeter. |
|
|
Note ID: | MS443 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Basement - Entrance Hall (A) | Work Type: | New Masonry Construction | Notes: | No finishes have been installed in the new Entrance Hall or in the new Dry Storage (which will soon hold the new wet and dry sprinkler systems). New utility lines feeding the space have been roughed in. |
|
|
Note ID: | MS441 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Basement - Hall (E) / Service Hall (R) | Work Type: | New Finish Application | Notes: | Walls of the Service Hall, including the short hall leading to the new Entrance Hall and elevator, have been drywalled but not taped or primed. Most doorways have been cased. The grid for the suspended acoustical ceiling is being installed. |
|
|
Note ID: | MS438 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Basement - Hall (E) / Service Hall (R) | Work Type: | New Finish Application | Notes: | Walls of the Service Hall have been drywalled but not taped or primed. Most doorways have been cased. |
|
|
Note ID: | MS442 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Basement - Kitchen (E/R) | Work Type: | New Finish Application | Notes: | Drywall has been installed on most of the kitchen walls. A former window opening has been greatly enlarged on the north wall. The entrance to the new Entrance Hall and addition has been moved. The opening has been repaired with steel lintels, new brick and Portland cement mortar. |
|
|
Note ID: | MS444 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Basement - Kitchen Service Area (E) / Serving Scullery (R) | Work Type: | Framing | Notes: | The area where the new walk-in refrigerator and freezer will be installed, at the north end of the Serving/Scullery, is being prepared for these appliances. |
|
|
Note ID: | MS437 | Weather Conditions: | Sunny, low 90s | Report Author: | Mary Harding Sadler | Report Date: | 7/24/1999 | Location: | Mansion - Basement - Mansion Director (E/R) | Work Type: | New Finish Application | Notes: | The walls of the Mansion Director's Office have been drywalled and primed. The grid for the suspended acoustical tile ceiling is installed. The double tenon joints supporting the header carrying the hearth and fireplace above are almost completely concealed by new utility lines. |
|