Note ID: | MS507 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - Second Floor - East Bedroom (E) / First Lady's Dressing and Bathroom (R) | Work Type: | Framing | Notes: | The north wall of the new First Lady's Dressing Room has been framed. It intersects a window opening that appears to have been installed ca. 1906 when the dining room addition was built. |
|
|
Note ID: | MS508 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - Second Floor - East Bedroom (E) / First Lady's Dressing and Bathroom (R) | Work Type: | Framing | Notes: | The walls and ceiling of the new First Lady's Dressing room have been framed up and the utilities roughed in. |
|
|
Note ID: | MS506 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - Second Floor - Northeast Bedroom and Bath (E) / Family Room (R) | Work Type: | Framing | Notes: | The south wall of the new Family Room has been framed. It intersects a window opening that appears to have been installed ca. 1906 when the dining room addition was built. |
|
|
Note ID: | MS505 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - Second Floor - Northeast Bedroom and Bath (E) / Family Room (R) | Work Type: | Demolition | Notes: | The window (an original opening) has been removed from the opening which will be enlarged to create a passage between the new Elevator Foyer and the new Family Room. |
|
|
Note ID: | MS510 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - Second Floor - Private Dining Room, Bathroom, and Powder Room (E) / Bedroom and Bathroom #3 (R) | Work Type: | Framing | Notes: | An original window opening in the east wall (a recess used for bathroom storage) has been framed over with steel studs. It will soon be a seamless section of the east wall of Bedroom #3. |
|
|
Note ID: | MS494 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Mansion - South Elevation | Work Type: | On-site paint removal | Notes: | At the exterior, scaffolding has been erected to facilitate paint removal and repainting. Paint removal continues beneath a polyethylene tent covering the South Portico. |
|
|
Note ID: | MS495 | Weather Conditions: | Partly cloudy, high 80s | Report Author: | Mary Harding Sadler | Report Date: | 8/2/1999 | Location: | Site - General | Work Type: | Demolition | Notes: | Old paving is removed from the driveway behind the Mansion. No artifacts are seen or reported found in the spoils. The granite curbing is stockpiled behind the Carriage House. |
|
|
Note ID: | JL231 | Weather Conditions: | Sunny, mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 8/4/1999 | Location: | Mansion - Basement - Entrance Hall (A) | Work Type: | New Masonry Construction | Notes: | Video and digital photos inside new northeast addition showing completion of new concrete block walls at elevator shaft and exterior walls. Workers cleaning out construction debris. Detailed views of historic exterior walls now enclosed by new addition. |
|
|
Note ID: | JL232 | Weather Conditions: | Sunny, mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 8/4/1999 | Location: | Mansion - Basement - Hall (E) / Service Hall (R) | Work Type: | New Finish Application | Notes: | Video and digital photos of workers installing grout in new quarry tile flooring. |
|
|
Note ID: | JL230 | Weather Conditions: | Sunny, mid 80s | Report Author: | Joseph D. Lahendro | Report Date: | 8/4/1999 | Location: | Mansion - East Elevation | Work Type: | New Masonry Construction | Notes: | Video and digital photos of brick infill of former exterior door to kitchen. |
|