Governor's Mansion Renovation All Records
|
Note ID: | JL265 | Weather Conditions: | Sunny, mid 80's | Report Author: | Joseph D. Lahendro | Report Date: | 8/9/1999 | Location: | Mansion - Second Floor - General | Work Type: | Miscellaneous | Notes: | Video of general construction progress, including gypsum board, insulation and wood framing installation. |
No image available
|
|
Note ID: | JL257 | Weather Conditions: | Sunny, mid 80's | Report Author: | Joseph D. Lahendro | Report Date: | 8/9/1999 | Location: | Mansion - South Elevation | Work Type: | On-site paint removal | Notes: | Video and digital photos of south portico showing progress of paint removal. Bulk paint removal, using heat guns and scrappers, is about 90% complete. |
|
|
Note ID: | JL256 | Weather Conditions: | Sunny, mid 80's | Report Author: | Joseph D. Lahendro | Report Date: | 8/9/1999 | Location: | Mansion - West Elevation | Work Type: | On-site paint removal | Notes: | Video and digital photos of Peel-Away paint remover applied to stone belt course. |
|
|
Note ID: | JL255 | Weather Conditions: | Sunny, mid 80's | Report Author: | Joseph D. Lahendro | Report Date: | 8/9/1999 | Location: | Mansion - West Elevation | Work Type: | Demolition | Notes: | Video and digital photos of landscape outside northwest and southwest corners of the house following removal of magnolia trees in these areas. |
|
|
Note ID: | JL269 | Weather Conditions: | Sunny, Low 90's | Report Author: | Joseph D. Lahendro | Report Date: | 8/13/1999 | Location: | Mansion - Basement - Hall (E) / Service Hall (R) | Work Type: | New Finish Application | Notes: | Video and digital photos of carpenter installing new door casing. Views of stored millwork--sections of new stairs to go around dumbwaiter. |
|
|
Note ID: | JL270 | Weather Conditions: | Sunny, Low 90's | Report Author: | Joseph D. Lahendro | Report Date: | 8/13/1999 | Location: | Mansion - Basement - Hall (E) / Stairhall (R) | Work Type: | New Finish Application | Notes: | Video and digital photos of newly installed gypsum board ceiling that now hides utility lines above. |
|
|
Note ID: | JL271 | Weather Conditions: | Sunny, Low 90's | Report Author: | Joseph D. Lahendro | Report Date: | 8/13/1999 | Location: | Mansion - Basement - Security Office (E) / Executive Protection Unit (R) | Work Type: | New Finish Application | Notes: | Video and digital photos of newly finished wall next to historic, underpinned wall. |
|
|
Note ID: | JL274 | Weather Conditions: | Sunny, Low 90's | Report Author: | Joseph D. Lahendro | Report Date: | 8/13/1999 | Location: | Mansion - First Floor - Breakfast Room (E/R) | Work Type: | Demolition | Notes: | Video and digital photos of removal of the west door and frame, which exposes mid-twentieth century framing below. On the north wall, the wainscot has been removed west of the door, and has exposed a brick extension, roughly in the center, that has been cut back below the later finishes. This extension may have been a former wall or pier. To the right of this extension, there is a painted brick wall with a paint ghost next to the extension (wood encased pier or pilaster?), and left of the extension is twentieth century plaster on metal lath. These early finishes and alterations relate to early twentieth century changes to this area when it was an outside eating porch converted to an enclosed breakfast room. |
|
|
Note ID: | JL273 | Weather Conditions: | Sunny, Low 90's | Report Author: | Joseph D. Lahendro | Report Date: | 8/13/1999 | Location: | Mansion - First Floor - Entrance Hall (E/R) | Work Type: | New Finish Application | Notes: | Video and digital photos of workmen washing south and west walls, with water, sponges and scrapers, to remove paste from former wall covering, in preparation for new finish painting. |
|
|
Note ID: | JL272 | Weather Conditions: | Sunny, Low 90's | Report Author: | Joseph D. Lahendro | Report Date: | 8/13/1999 | Location: | Mansion - First Floor - Old Governor's Office (E/R) | Work Type: | New Finish Application | Notes: | Video and digital photos of carpenters end gluing sections of salvaged wainscot (formerly in the north stair floor) for reuse as wainscot on the east wall. Views of two repaired sections in place north of fireplace. |
|