Pages :   1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125   Previous  Next Page

Note ID: JL309
Weather Conditions: Cloudy, mid 70s
Report Author: Joseph D. Lahendro
Report Date: 8/31/1999
Location: Mansion - Second Floor - North Stair (E/R)
Work Type: Demolition
Notes: Video and digital photos of the ceiling above the stair landing where a section of the painter's canvas has been removed exposing a rectangular area of plaster infill in the ceiling. The infill is approximately 2.5' x 4', with the long dimension running east-west. It appears to relate to the access hatch found in the attic floor directly above this area. This former opening is probably the original, or, at least, very early, access hatch to the attic from the lower floors before a stair was installed.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: JL308
Weather Conditions: Cloudy, mid 70s
Report Author: Joseph D. Lahendro
Report Date: 8/31/1999
Location: Mansion - Second Floor - Northeast Bedroom and Bath (E) / Family Room (R)
Work Type: Demolition
Notes: Video and digital photos of east window frame and stone sill removed, and brick below window opening removed, all to create a new door to the northeast addition. A portion of the broken stone sill on the floor is documented.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  
Governor's Mansion Renovation Photograph  


Note ID: JL310
Weather Conditions: Cloudy, mid 70s
Report Author: Joseph D. Lahendro
Report Date: 8/31/1999
Location: Mansion - Second Floor - Old Governor's Bedroom (E/R)
Work Type: Demolition
Notes: Video of worker removing brick with jackhammer behind the baseboard to create a chase for new electrical conduits. Roughly a section two bricks high by one brick wythe deep is being removed around most of the room. After the conduit is installed, the open chase will be refilled with grout before reinstalling the baseboard. Baseboards in the Capitol Room and Lafayette Room have been removed in preparation for the same treatment.


No image available


Note ID: JL307
Weather Conditions: Cloudy, mid 70s
Report Author: Joseph D. Lahendro
Report Date: 8/31/1999
Location: Mansion - South Elevation
Work Type: On-site paint removal
Notes: Video and digital photos of workers removing paint from brick façade at eastern end. A plastic tent has been created using the scaffolding as framework. Workers inside the isolation tent are rinsing off Peel-Away chemical remover, that was sprayed on and allowed to loosen the paint. A plastic trough on the ground below the tent collects the residue and rinse water. The residue sinks to the bottom and the water is siphoned off, filtered, and collected in steel drums that are transported for off-site regulated disposal. The residue is collected in containers and, also, disposed off-site in a hazardous material waste site.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: JL306
Weather Conditions: Cloudy, mid 70s
Report Author: Joseph D. Lahendro
Report Date: 8/31/1999
Location: Mansion - West Elevation
Work Type: On-site paint removal
Notes: Video and digital photos of workers removing paint from second floor window frame.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: MS614
Weather Conditions:
Report Author: Mary Harding Sadler
Report Date: 9/3/1999
Location: Mansion - Attic
Work Type: New Finish Application
Notes: New drywall has been installed, taped, and mudded in the attic. A suspended ceiling grid is in place, though no ceiling tiles have been installed.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: MS603
Weather Conditions:
Report Author: Mary Harding Sadler
Report Date: 9/3/1999
Location: Mansion - East Elevation
Work Type: New Masonry Construction
Notes: The foundation for the utility yard adjacent to the Kitchen is under construction.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: MS599
Weather Conditions:
Report Author: Mary Harding Sadler
Report Date: 9/3/1999
Location: Mansion - First Floor - Entrance Hall (E/R)
Work Type: New Finish Application
Notes: New paint colors are being tested on the walls of the Entrance Hall.


Governor's Mansion Renovation Photograph  


Note ID: MS601
Weather Conditions:
Report Author: Mary Harding Sadler
Report Date: 9/3/1999
Location: Mansion - First Floor - North Foyer (E/R)
Work Type: Miscellaneous
Notes: The walls of the North Foyer are being repaired with ready-mix concrete and plaster. Rot in the base (non-original) of the North Portico columns has become more evident after paint removal.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: MS600
Weather Conditions:
Report Author: Mary Harding Sadler
Report Date: 9/3/1999
Location: Mansion - First Floor - Stair Hall (E/R)
Work Type: New Finish Application
Notes: New paint colors are being tested on the walls of the Stairhall.


Governor's Mansion Renovation Photograph  

Pages :   1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125   Previous  Next Page