Pages :   1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125   Previous  Next Page

Note ID: MS615
Weather Conditions:
Report Author: Mary Harding Sadler
Report Date: 9/3/1999
Location: Mansion - Second Floor - Above Ballrooms
Work Type: New Finish Application
Notes: New drywall has been installed, taped, and mudded in the 2nd floor area above the Ballrooms. A long corridor connects the Family Room (on the north) to the bedrooms on the south.


Governor's Mansion Renovation Photograph  


Note ID: MS610
Weather Conditions:
Report Author: Mary Harding Sadler
Report Date: 9/3/1999
Location: Mansion - Second Floor - Bath #4 (E/R)
Work Type: Miscellaneous
Notes: The channel cut in the brick wall adjacent to the Bathroom #4 window has been filled with ready-mix concrete.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: MS612
Weather Conditions:
Report Author: Mary Harding Sadler
Report Date: 9/3/1999
Location: Mansion - Second Floor - Dressing Room and Bedroom (E) / Governor's Bedroom (R)
Work Type: New Finish Application
Notes: New trim is being installed and primed in the hallway leading to the new Governor's Bedroom. Drywall has been installed, taped, and mudded at walls and ceilings.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: MS606
Weather Conditions:
Report Author: Mary Harding Sadler
Report Date: 9/3/1999
Location: Mansion - Second Floor - Elevator Foyer (A)
Work Type: Miscellaneous
Notes: Workmen are installing the elevator machinery within the new shaft.


Governor's Mansion Renovation Photograph  


Note ID: MS609
Weather Conditions:
Report Author: Mary Harding Sadler
Report Date: 9/3/1999
Location: Mansion - Second Floor - Lafayette Room (E/R)
Work Type: Miscellaneous
Notes: The channel cut in the brick wall adjacent to the Lafayette Bedroom door has been filled with ready-mix concrete.


Governor's Mansion Renovation Photograph  


Note ID: MS611
Weather Conditions:
Report Author: Mary Harding Sadler
Report Date: 9/3/1999
Location: Mansion - Second Floor - Northeast Bedroom and Bath (E) / Family Room (R)
Work Type: Demolition
Notes: The new door opening has been created between the new Family Room and the new Elevator Foyer by lengthening the existing original window opening.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  


Note ID: MS604
Weather Conditions:
Report Author: Mary Harding Sadler
Report Date: 9/3/1999
Location: Mansion - Second Floor - Northeast Bedroom and Bath (E) / Family Room (R)
Work Type: Demolition
Notes: The window opening has been enlarged to create a door from the new Family Room into the Elevator Foyer. Some Family Room walls have been sheathed with gypsum drywall in preparation for new trim and finishes.


Governor's Mansion Renovation Photograph  


Note ID: MS608
Weather Conditions:
Report Author: Mary Harding Sadler
Report Date: 9/3/1999
Location: Mansion - Second Floor - Old Governor's Bedroom (E/R)
Work Type: Miscellaneous
Notes: The channel cut in the brick wall adjacent to the Old Governor's Bedroom door has been filled with ready-mix concrete.


Governor's Mansion Renovation Photograph  


Note ID: MS607
Weather Conditions:
Report Author: Mary Harding Sadler
Report Date: 9/3/1999
Location: Mansion - Second Floor - Old Governor's Bedroom (E/R)
Work Type: Miscellaneous
Notes: New 6-panel doors have been primed and brought on site for installation on the 2nd floor. They are being temporarily stored in the Old Governor's Bedroom.


No image available


Note ID: MS613
Weather Conditions:
Report Author: Mary Harding Sadler
Report Date: 9/3/1999
Location: Mansion - Second Floor - Private Dining Room, Bathroom, and Powder Room (E) / Bedroom and Bathroom #3 (R)
Work Type: New Finish Application
Notes: New trim is being installed and primed in Bedroom #3. Drywall has been installed, taped, and mudded at walls and ceilings.


Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  Governor's Mansion Renovation Photograph  

Pages :   1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125   Previous  Next Page

facebook twitter youtube instagram linkedin