Governor's Mansion Renovation All Records
|
Note ID: | MS605 | Weather Conditions: | | Report Author: | Mary Harding Sadler | Report Date: | 9/3/1999 | Location: | Mansion - South Elevation | Work Type: | On-site paint removal | Notes: | Paint removal continues on the south wall and on various elements of the South Portico, particularly the arched door casing. |
|
|
Note ID: | MS602 | Weather Conditions: | | Report Author: | Mary Harding Sadler | Report Date: | 9/3/1999 | Location: | Site - West Garden | Work Type: | Excavation | Notes: | Foundations are being excavated for the new guard house. The small 1950s guard house has been demolished. |
|
|
Note ID: | MS646 | Weather Conditions: | partly cloudy, low 80s | Report Author: | Mary Harding Sadler | Report Date: | 9/7/1999 | Location: | Cottage - East Elevation | Work Type: | Miscellaneous | Notes: | Stripped and repaired doors have been returned to the Cottage. The 2nd floor doors have been stripped (off-site) to bare wood and await priming. |
|
|
Note ID: | MS640 | Weather Conditions: | partly cloudy, low 80s | Report Author: | Mary Harding Sadler | Report Date: | 9/7/1999 | Location: | Mansion - Attic | Work Type: | New Finish Application | Notes: | New drywall is being installed in the attic, in the storage areas. At the chimney masses some of the masonry has been altered to shape access into the perimeter spaces required to maintain or repair utilities. |
|
|
Note ID: | MS632 | Weather Conditions: | partly cloudy, low 80s | Report Author: | Mary Harding Sadler | Report Date: | 9/7/1999 | Location: | Mansion - Basement - Dry Storage (A) | Work Type: | New Masonry Construction | Notes: | Masonry repairs continue where new or altered openings connect existing spaces to the new addition. The door from the Dry Storage (now Sprinkler System Control) into the Kitchen has been repaired with steel lintels, new and salvaged brick, and Portland cement. |
|
|
Note ID: | MS634 | Weather Conditions: | partly cloudy, low 80s | Report Author: | Mary Harding Sadler | Report Date: | 9/7/1999 | Location: | Mansion - Basement - Hall (E) / Hall and Dumbwaiter (R) | Work Type: | Miscellaneous | Notes: | New kitchen equipment and appliances have arrived for installation, now that most finishes are in. The ceiling remains open to allow for completion of utilities installation. |
|
|
Note ID: | MS637 | Weather Conditions: | partly cloudy, low 80s | Report Author: | Mary Harding Sadler | Report Date: | 9/7/1999 | Location: | Mansion - Basement - Hall (E) / Service Hall (R) | Work Type: | Miscellaneous | Notes: | In the Service Hall walls and trim have been primed. No ceiling tile have been installed. |
|
|
Note ID: | MS633 | Weather Conditions: | partly cloudy, low 80s | Report Author: | Mary Harding Sadler | Report Date: | 9/7/1999 | Location: | Mansion - Basement - Kitchen (E/R) | Work Type: | Miscellaneous | Notes: | New kitchen equipment and appliances have arrived for installation, now that most finishes are in. The ceiling remains open to allow for completion of utilities installation. |
|
|
Note ID: | MS635 | Weather Conditions: | partly cloudy, low 80s | Report Author: | Mary Harding Sadler | Report Date: | 9/7/1999 | Location: | Mansion - Basement - Restroom Hall (R) | Work Type: | Miscellaneous | Notes: | At the end of the Restroom Hall, the elevator equipment and machinery is being moved into place. A 3 ft. tall stack of weights sits in the hall awaiting installation. |
|
|
Note ID: | MS636 | Weather Conditions: | partly cloudy, low 80s | Report Author: | Mary Harding Sadler | Report Date: | 9/7/1999 | Location: | Mansion - Basement - Security Office (E) / Executive Protection Unit (R) | Work Type: | Miscellaneous | Notes: | Electricians are beginning to install light fixtures in the Security Office. The walls have been primed. |
|