Note ID: | MS683 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Mansion - Second Floor - Lafayette Room (E/R) | Work Type: | Miscellaneous | Notes: | Pencilled notes (the name of the carpenter? "P. Perkinson"?) have been found on a piece of a window jamb in the Lafayette Bedroom. |
|
|
Note ID: | MS691 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Mansion - Second Floor - Lafayette Room (E/R) | Work Type: | New Finish Application | Notes: | Drywall has been laminated to the ceiling of the Lafayette Bedroom. |
|
|
Note ID: | MS668 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Mansion - South Elevation | Work Type: | On-site paint removal | Notes: | Paint removal is complete on the south elevation and polyethylene sheeting has been taken down. The roof balustrade has not yet been restored. The South Portico has been primed. |
|
|
Note ID: | MS657 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Site - General | Work Type: | Excavation | Notes: | The new driveway on the north and east sides of the site is being graded. The driveway slope becomes steeper along the north side to create a handicap accessible entry at the new addition. Granite curbing removed from the earlier driveway has been stacked up along the east wall of the South Garden. |
|
|
Note ID: | MS667 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Site - South Garden | Work Type: | New Masonry Construction | Notes: | New cast stone steps have been installed along the west side of the garden. Temporary wood railings remain while original railings are stripped and repaired off-site. |
|
|
Note ID: | MS664 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Site - South Garden | Work Type: | Demolition | Notes: | A section of wall at the southeast corner of the South Garden has been removed and will be slightly reconfigured. |
|
|
Note ID: | MS656 | Weather Conditions: | Partly cloudy, low 60s | Report Author: | Mary Harding Sadler | Report Date: | 9/22/1999 | Location: | Site - West Garden | Work Type: | Framing | Notes: | The new Guard House has been framed up. |
|
|
Note ID: | JL338 | Weather Conditions: | Sunny low 80s | Report Author: | Joseph D. Lahendro | Report Date: | 9/25/1999 | Location: | Cottage - East Elevation | Work Type: | New Masonry Construction | Notes: | Video and digital photos of new brick paving installed at east terrace of cottage. |
|
|
Note ID: | JL329 | Weather Conditions: | Sunny low 80s | Report Author: | Joseph D. Lahendro | Report Date: | 9/25/1999 | Location: | Mansion - East Elevation | Work Type: | Miscellaneous | Notes: | Video and digital photos of new courtyard construction next to mansion. Ductwork installed in new underground tunnel for kitchen exhaust fan. CMU foundation wall installed for new courtyard wall to hide equipment against mansion (louvers, ducts, vents, etc.) Driveway removed. |
|
|
Note ID: | JL344 | Weather Conditions: | Sunny low 80s | Report Author: | Joseph D. Lahendro | Report Date: | 9/25/1999 | Location: | Mansion - First Floor - Dining Room (E/R) | Work Type: | Demolition | Notes: | Video and digital photos of painter's canvas being removed from the plaster walls. Plaster surfaces beneath canvas has plaster ghosts from prior changes, most notably where original panel moldings where removed for adding the niches. Also exposed is a penciled inscription on west plaster wall, north of pocket doors, which is as follows: "Canvas put on by M.L. Huber, March 1957." |